A new build works best when the site, design and approvals are treated as one joined decision. In Acton, that means checking the plot properly first, then building a specification that fits the site rather than forcing a standard house onto it.

- Service
- New build
- Neighbourhood
- Acton
- Borough
- Ealing
- Next step
- Discuss your project
Your project brief
Start with the site, not the floor plan
A new home needs a layout that responds to boundaries, access and the constraints of the plot. Before the design is fixed, it is sensible to confirm where a vehicle or delivery route can work, where the building can sit, and whether any retained features or services affect the arrangement.
That early reading of the site also helps with room planning. If the main outlook or best light is limited, it may be better to place the most-used spaces there and keep plant, storage or circulation to the less favourable parts of the plan.
Acton local-check point for a new home
Ealing’s conservation-area page is a useful starting point for local checks, because it confirms that some areas have extra controls and that permitted development rights are restricted in those places. It also identifies several areas with further Article 4 restrictions. That is evidence for checking, not proof that a specific Acton plot is affected, so the exact address must be verified before the design route is chosen.
Design decisions
Build the compliance and information trail early
Planning responsibility, building control and any owner or lease consent are separate questions and should be sorted before construction starts. A new dwelling is not a case of assuming a householder route or relying on general rules; the site and proposal need their own route to approval.
The contract scope should also define structural information, services strategy and inspection points. That gives everyone a clearer picture of what must be supplied, when checks happen and what evidence is needed at completion.
Design checks
Four things we confirm before drawing a new-build home.
- 01Establish plot boundaries, access and site constraints.
- 02Coordinate the design, structural information and services strategy.
- 03Confirm planning and building-control responsibilities before construction.
- 04Define specifications, inspections and completion evidence in the contract scope.
What makes a new build different from a major refurbishment?
A new build starts with a site that must support the whole home from scratch, so boundaries, access, services and approvals all shape the design. A refurbishment begins with an existing structure, which changes what can be retained and altered.
Why do I need structural and services information before I start?
Because the layout, foundations, drainage, heating and electrical plan all affect one another. If those details are left too late, the build can stall or the design may need revising. Clear information early helps the programme stay coordinated.
What should completion evidence cover?
It should show what has been built, what has been checked and what documents are needed for handover. That may include inspection records, product information and confirmation of any agreed approvals, so the home can be used and maintained properly.
Planning and project guidance
- Management within conservation areas | About conservation areas | Ealing Council
- GOV.UK · Planning permission
- GOV.UK · Building regulations approval
- GOV.UK · Party walls and building work
Check the current guidance for your address before relying on a planning route. This guide is not a planning decision or a verified local case study.