What a renovation can cover
- Layout changes: removing or moving internal walls, with structural design where a wall is load-bearing.
- Services: full or partial rewiring, replumbing, heating upgrades and new drainage runs.
- Fabric repairs: damp investigation, replastering, floor replacement, roof and chimney repairs.
- Thermal upgrades: insulation, windows and ventilation planned together so the house still breathes.
- Kitchens, bathrooms and finishes, sequenced after the messy work rather than before it.
Constraints to understand early
Older London and county houses hide surprises: lath and plaster ceilings, shallow footings, lead pipework, and earlier alterations without records. We recommend opening-up checks where it matters, so allowances in the price reflect what is actually behind the walls.
Occupancy also shapes the programme. Some homeowners can stay during limited cosmetic phases. A full renovation involving rewiring, heating and floors may require temporary accommodation, depending on how essential services and safe access can be maintained. Agree this before booking work.
Approvals and paperwork
Many purely internal alterations do not need planning permission, but that does not settle every consent. Listed building consent may be needed for internal work affecting a listed building’s character. External changes require separate checks, including conservation-area controls and any relevant Article 4 direction. Building Regulations can apply to structural alterations, drainage, electrical and thermal work. Work affecting party structures or relevant boundaries may engage a separate statutory process. Confirm the applicable routes with your designer, building control body and relevant specialists before starting, and retain the completion records.
How the process runs
- Consultation and survey: we walk the house with you and agree what you want to change.
- Design and structural input: drawings and calculations where the work needs them.
- Fixed written price: itemised scope, allowances and exclusions laid out in plain terms.
- Strip-out and first fix: structure, wiring, pipework and inspections.
- Second fix and finishes: plastering, joinery, kitchens, bathrooms and decoration.
- Handover: snagging, certificates and a walk-through of the finished house.
Combining with an extension or loft
If you are already considering a loft conversion or extension, renovating at the same time usually avoids doing the same rooms twice. We can phase the work so the new space and the existing house are finished together.