Wandsworth · South London
New buildin Putney.
A new home is not just a bigger version of a renovation. The design has to start with the site, the boundaries, access and the information needed to build safely and lawfully. Good early decisions reduce later clashes between structure, services and finish choices.

- Service
- New build
- Neighbourhood
- Putney
- Borough
- Wandsworth
- Next step
- Discuss your project
Your project brief
Two practical layout choices to test early
One feasible layout might prioritise straightforward circulation: an entry, living space and service zones arranged so daily movement is direct and easy to maintain. Another could focus on separating quieter rooms from busier spaces, which may suit a home where different activities need more privacy or less noise.
Neither layout should be chosen by appearance alone. The survey and design work must test whether the site can support the foundations, drainage, servicing and access the layout needs, because a plan that looks efficient on paper may be poor once those constraints are known.
Putney site checks and council context
Putney addresses in Wandsworth may sit within areas where conservation appraisals are used to guide planning decisions, but that must be checked against the exact plot and not assumed from the neighbourhood name alone. For a new build, the planning route is site-specific and should be assessed with the survey, the title information and the proposed footprint, rather than relying on householder-style assumptions.
Design decisions
What has to be settled before construction starts
The boundaries, access points and site constraints need confirming before the build contract is fixed. That includes how materials will reach the plot, where storage can sit and which parts of the site are available for construction without affecting adjoining land or rights of way.
The next step is to coordinate planning responsibilities, building-control responsibilities, structural information and services strategy. Completion evidence should also be defined in advance so the handover records match the actual scheme and there is no confusion over what has been installed and checked.
Design checks
Four things we confirm before drawing a new-build home.
- 01Establish plot boundaries, access and site constraints from the outset.
- 02Coordinate the design, structural information and services strategy together.
- 03Confirm planning and building-control responsibilities before construction.
- 04Define specifications, inspections and completion evidence in the contract scope.
What should the survey settle first on a new build site?
It should establish what the plot actually contains, how it can be accessed and what constraints affect the build. That includes boundaries, ground conditions in practical terms, services connections and any adjoining issues that could alter the scheme.
How do I compare two possible layouts for a new home?
Compare them by daily use: one may work better for entertaining and shared movement, while another may suit quieter family routines. The best choice is the one that fits the site constraints without creating avoidable complexity in structure or services.
Why do planning and building-control responsibilities need separating early?
They are different parts of the process. One concerns the acceptability of the proposal, while the other concerns how the work is checked as it is built. Separating them early helps prevent delays and missing information later on.
Planning and project guidance
- Conservation area appraisals - Wandsworth Borough Council
- GOV.UK · Planning permission
- GOV.UK · Building regulations approval
- GOV.UK · Party walls and building work
Check the current guidance for your address before relying on a planning route. This guide is not a planning decision or a verified local case study.
Other services in Putney








