A new build is decided long before the first digger arrives. The key questions are whether the plot can support the design, how access and services will work, and which approvals must be settled before construction is allowed to progress.

- Service
- New build
- Neighbourhood
- Shepherd's Bush
- Borough
- Hammersmith and Fulham
- Next step
- Discuss your project
Your project brief
Begin with the site, not the floor plan
A new home cannot be designed properly if boundary lines, access routes and on-site working space are unclear. Those basics affect how materials arrive, where waste leaves the site and how the building can be positioned without creating avoidable clashes with neighbours or services.
If the land is constrained, the house form, opening sizes and construction sequence may all need to adjust. The right approach is to test the site first, then shape the proposal around what is practical, safe and lawful to build.
Local checks for a Shepherd's Bush new build
Hammersmith and Fulham Council’s planning guidance asks applicants to consider flood risk, sustainable drainage, design and access statements where relevant, energy statements for major schemes, contaminated land and party wall matters. Use the council planning search against the exact address so site status is checked properly. Borough guidance is a starting point, not proof that every plot faces the same requirements.
Design decisions
Build the paperwork into the programme
Planning and building control are separate responsibilities, and the contract scope should say who is doing what. For a new dwelling, the route is site-specific rather than a simple householder assumption, so the approvals path should be mapped before design details become fixed.
Completion records matter too. The specification should set out what inspections, test results and handover documents are needed, so the finished home is supported by evidence rather than relying on memory or informal notes.
Design checks
Four things we confirm before drawing a new-build home.
- 01Establish plot boundaries, access and any visible site constraints early.
- 02Coordinate the design, structural information and services strategy together.
- 03Confirm planning, building-control and ownership or lease responsibilities before starting.
- 04Define specifications, inspection points and completion evidence in the contract scope.
Questions
Before you call about Shepherd's Bush.
What should be settled before a new-build design is fixed?
The site constraints, access arrangements, likely service routes and approval path should all be checked first. Otherwise the design may need expensive revision when construction planning, utility coordination or consent questions are finally addressed.
Why do completion records matter on a new home?
They show what was installed, tested and inspected, and they help handover run smoothly. A well-written scope should say which certificates, test results and as-built details are required before completion is accepted.
How can assumptions be handled if the plot is still being assessed?
Put them in writing as provisional items. For example, if a service connection route is assumed but not yet confirmed, record that the final route is subject to survey, utility advice and the chosen build sequence.
Planning and project guidance
- Planning guidance | London Borough of Hammersmith & Fulham
- GOV.UK · Planning permission
- GOV.UK · Building regulations approval
- GOV.UK · Party walls and building work
Check the current guidance for your address before relying on a planning route. This guide is not a planning decision or a verified local case study.