A new build succeeds when each decision depends on the last one. The plot, access and boundaries shape the design; the design shapes structure and services; and those shape the finish. If the sequence is wrong, the scheme can be redesigned halfway through.

- Service
- New build
- Neighbourhood
- Brentford
- Borough
- Hounslow
- Next step
- Discuss your project
Your project brief
Test the site before the house shape is fixed
A new dwelling needs a site-specific route from the start, not a borrowed approach from another project. Boundaries, access, setbacks, storage space, drainage intentions and working room should all be understood before the footprint is finalised. That prevents later changes to openings, roof form or service runs.
If the brief is for a home that can adapt to changing family life, the plan may need a restrained, flexible arrangement rather than a highly specific one. For example, a ground-floor room might be kept usable for work, play or guests, with circulation and storage designed to support more than one use.
Brentford site checks with Hounslow guidance in mind
Hounslow Council says conservation areas bring added planning control, and that some external changes can be restricted by Article 4 directions. It also notes that permitted development does not apply to flats, or houses converted to flats, for external changes. For a new build in Brentford, the exact address and planning route still have to be checked, because borough-wide guidance is only a starting point, not proof of what applies to a particular plot.
Design decisions
Coordinate structure, services and finish decisions together
Structure comes before the detailed appearance, because the frame, floors and roof set the limits for everything else. Once the structural route is known, the services strategy can follow: where pipes, ducting, wiring and plant need space, and where access for maintenance should be kept clear. Finishes should then be chosen to suit those routes.
Planning responsibility, building-control responsibility and any ownership or lease consents should be sorted out before work starts on site. A clear contract scope should also state what evidence is needed at completion, so the handover includes the records the project actually needs rather than a late scramble for paperwork.
Design checks
Four things we confirm before drawing a new-build home.
- 01Establish boundaries, access and any site constraints before freezing the design.
- 02Confirm the structural information and services strategy alongside the layout.
- 03Agree who is responsible for planning, building control and any other consents.
- 04List the specifications, inspections and completion evidence in the contract scope.
Questions
Before you call about Brentford.
What should be settled first on a new-build project?
Start with the site: its limits, access and practical constraints. Once those are clear, the design can be shaped around them instead of being forced into place later.
Why are structure and services discussed together?
Because they compete for the same space. A good plan decides where the frame goes, then reserves routes for water, drainage, wiring and ventilation before finishes are fixed.
What completion records are worth asking for?
Ask for the records tied to the agreed scope, such as inspection evidence, product details and any certificates that apply. The exact list should match the project and the specialists used.
Planning and project guidance
- Conservation areas FAQ | Design and conservation | London Borough of Hounslow
- GOV.UK · Planning permission
- GOV.UK · Building regulations approval
- GOV.UK · Party walls and building work
Check the current guidance for your address before relying on a planning route. This guide is not a planning decision or a verified local case study.