Lewisham · South London
Kitchensin Catford.
A kitchen quote should tell you whether you are buying cabinets only, an installation, or a fuller room project. The difference matters because the best kitchen layout still depends on the plumbing, electrics, flooring and wall work that support it.

- Service
- Kitchens
- Neighbourhood
- Catford
- Borough
- Lewisham
- Next step
- Discuss your project
Your project brief
Separate the cabinet package from the building work
The unit list is only one part of the job. Removal of the old kitchen, wall and floor repairs, levelling, services alterations and finishing details can all sit outside a simple supplier price unless they are clearly added into the scope.
When you compare quotes, check whether the contractor has allowed for alignment, fillers, plinths, end panels and the small finishes that make the room look complete. Those items are easy to overlook, but they affect both the cost and the final result.
Catford address checks for kitchen work
Lewisham’s pages list conservation areas in the borough, but that information does not establish the status of any particular Catford property. Kitchen work is usually inside the home, yet if the project includes structural openings, external changes or alterations affecting the building’s character, the exact address must be checked before relying on a general borough assumption.
Design decisions
Design the sequence before you sign off the details
Kitchen work often needs decisions in the right order. Worktops depend on final cabinet positions, while services need to be in place before the room is closed and decorated. A good brief sets out who measures what, when the fit is confirmed and what remains provisional.
If the kitchen is part of a phased refurbishment, the scope should also protect the surrounding rooms. For example, a temporary cooking setup or a later floor finish may need to be planned now so the build sequence does not damage the finished kitchen later.
Design checks
Four things we confirm before drawing a kitchen installation.
- 01Confirm whether removal, making good and disposal are included.
- 02Check cabinet fit, worktop measurement and final adjustment responsibility.
- 03Identify plumbing, electrical and flooring items within the quote.
- 04Agree the order of trades so later work does not damage earlier finishes.
Why do kitchen quotes vary so much between contractors?
They often include different assumptions. One may price only the cabinet fitting while another includes preparation, services, trimming and finishing details, so the totals are not directly comparable.
Do worktops need to be ordered before everything else is fixed?
No. The base cabinets and final room dimensions need to be settled first. The quote should make clear who is responsible for final measurement and what happens if the layout changes.
What should a kitchen brief say if I am updating the room in stages?
It should say what is being installed now, what is being protected for later and how the sequence affects plumbing, electrics and flooring. That prevents the first stage from blocking the second.
Planning and project guidance
- Lewisham Council - Conservation areas
- GOV.UK · Planning permission
- GOV.UK · Building regulations approval
- GOV.UK · Party walls and building work
Check the current guidance for your address before relying on a planning route. This guide is not a planning decision or a verified local case study.