New buildin Catford.
A new home is more than a set of drawings. The brief has to link the site, the design, the structural strategy, services and the paperwork needed at completion, otherwise the build can drift between assumptions that never quite match the plot.

- Service
- New build
- Neighbourhood
- Catford
- Borough
- Lewisham
- Next step
- Discuss your project
Your project brief
Make the plot information do real work
Before prices are compared, the plot boundaries, access arrangements and site constraints need to be clear. That includes how materials will be brought in, where spoil will go and what the contractor is expected to assume about the ground, neighbouring edges and temporary arrangements.
If the site information is incomplete, one quote may appear lower simply because it has not allowed for a problem another contractor has sensibly included. A fair tender pack should make the same assumptions visible to everyone, so the price reflects the same starting point.
Catford checks before the build route is fixed
Lewisham’s council information includes conservation areas in the borough, but that is only a starting point for checking a specific address. For a new dwelling, the planning route needs to be decided site by site rather than by general borough assumptions. If your plot is close to sensitive design constraints or a designated area, confirm the exact address position and the correct approval path before pricing begins.
Design decisions
Design, approvals and evidence should be joined up
A new-build brief should not separate the house design from the structural information and services strategy. The layout affects drainage, heating, wiring, ventilation and the sequence of inspections, so the contractor needs enough detail to price the work properly and plan the handover records.
Planning and building-control responsibilities also need to be clear before work starts. The contract scope should say who is preparing what, what evidence is required at completion and what will be needed for occupation, rather than leaving those items to be solved at the end.
Design checks
Four things we confirm before drawing a new-build home.
- 01Establish plot boundaries, access and site constraints.
- 02Coordinate the design, structural information and services strategy.
- 03Confirm planning and building-control responsibilities before construction.
- 04Define specifications, inspections and completion evidence in the contract scope.
What should a new-build quote say beyond the house price?
It should explain assumptions about the site, temporary access, services connections, structure, finishes and completion records. Without that detail, two quotes may be describing different levels of responsibility.
Why does plot information affect the final budget so much?
Because access, boundaries and site constraints influence groundwork, logistics and the sequence of trades. If those factors are unclear, allowances can be missing from an apparently competitive price.
Do approvals need to be settled before the build contract is signed?
They should be. The contract needs to reflect who is handling planning, building control and handover evidence, so the build programme is not based on unanswered compliance questions.
Planning and project guidance
- Lewisham Council - Conservation areas
- GOV.UK · Planning permission
- GOV.UK · Building regulations approval
- GOV.UK · Party walls and building work
Check the current guidance for your address before relying on a planning route. This guide is not a planning decision or a verified local case study.