01
Understand the site as well as the room
Share information about garden levels, nearby trees, drainage routes and access before settling on the size of an extension. A sketch that looks straightforward from above can need a different structural or drainage approach once the site is measured.
Consider where daylight enters the existing rooms and how the new floor will connect to the garden. Ask the designer to show finished levels, openings and the proposed use of the rooms, not only an external view of the addition.
02
Get the Bromley drawing package right
Bromley Council’s validation guidance sets out national and local submission requirements, including location plans and the existing and proposed drawings relevant to the works. It also explains that additional supporting information can depend on the site and the scale of the proposal.
Its guidance asks for current site photographs and for documents to be supplied as individual PDF files. Ask your designer to check the latest checklist before submission, including how dimensions and neighbouring relationships must be shown. Do not assume a contractor’s quotation sketch is an application-ready drawing.
03
Make the brief specific enough to price
Tell the team whether the extension includes a kitchen, utility room, bathroom or changes to the existing ground floor. Structural openings, glazing, heating and the chosen finish all affect the scope. Separate items you will supply yourself from those you expect the builder to include.
Before proceeding, request a written description of works, exclusions and the proposed construction sequence. Identify who is responsible for design coordination, building control and any specialist surveys. Avoid treating an early budget discussion as a fixed quotation for an unresolved design.
Bromley questions
Send the postcode, photographs, existing plans if available, intended room uses and any known access, level or drainage constraints. These help the team identify what a site visit and design brief need to cover.
The council’s published validation guidance includes current site photographs among its requirements. Check the latest guidance and the checklist for your particular application before submitting.
A tree may affect the layout, foundations and information needed for approval. Establish its location and any protection status, then obtain the relevant design and specialist advice rather than assuming it can be removed.



