Choose the layout before the footprint
A single-storey rear extension can open up new possibilities for a kitchen or family space. A side or wraparound scheme may offer a different connection between rooms. Compare layouts against circulation, daylight and the garden space you want to retain.
Keep the centre of the existing house in the conversation. A deeper extension can leave an internal room darker unless the lighting strategy is considered early. Ask for the proposed furniture positions, openings and rooflight arrangement to be shown together.
02
Use Wandsworth’s permission checks
Wandsworth Council distinguishes permitted development from work requiring an application. Its guidance states that householder permitted development does not apply to flats and points homeowners to conservation-area and Article 4 information.
If the property is a flat, a converted house or subject to restrictions, do not use a standard house-extension rule as a shortcut. Confirm the planning route for the address. Where an application is needed, use the council’s local validation requirements to prepare the submission.
03
Think about access and neighbouring homes
Discuss how materials, waste and workers will reach the rear of the property. If access is through the house, ask how occupied rooms and existing finishes will be protected. Clarify any permissions needed for skips or use of the public highway.
Boundary positions, party-wall matters, drainage and the relationship with neighbouring windows should be identified before construction is scheduled. Request a written programme and scope, with responsibilities for approvals and any specialist advice made clear.
Wandsworth questions
Wandsworth Council says these rights do not apply to flats. Obtain advice on the correct application route and check leaseholder or freeholder consents separately.
Compare how each option improves the existing rooms, daylight, access and garden relationship. The right solution depends on your property and planning position rather than which design adds the most floor area.
That depends on the scope, access, services and construction sequence. Ask for a project-specific plan covering dust separation, security, temporary facilities and any period when rooms or utilities cannot be used.