Electrical decisions are easiest when they are made before the surfaces are finished. The main question is not just where fittings go, but how the room will be used and what needs to happen behind the walls to support that layout safely and neatly.

- Service
- Electrical work
- Neighbourhood
- Lewisham
- Borough
- Lewisham
- Next step
- Discuss your project
Your project brief
Plan the layout around use, furniture and appliances
A lighting and socket plan should follow the way the room will work in practice. That means thinking about where people stand, where furniture sits and which appliances need dedicated provision. If the room is being rearranged, the existing positions may no longer make sense, so it is worth reviewing them as part of the wider design.
Where a refurbishment changes walls or cabinets, electrical routes need to be coordinated early so they are not trapped behind later finishes. That is especially important in kitchens and bathrooms, where the visible layout and the hidden service work have to match closely.
Lewisham checks for electrical work in a specific home
Lewisham’s planning information and conservation-area pages are useful starting points, but they do not tell you what applies to every address. Electrical work inside the home normally depends on the project itself, though wider alterations may also involve planning or listed-building questions. Check the exact property and the full scope before finalising the route, especially if the work sits within a larger refurbishment.
Design decisions
Keep inspection and documentation in the scope
Electrical work should include the necessary testing and completion records within the agreed scope. The details depend on the installation, but the key point is to identify what documentation will be needed before work begins. That avoids confusion at handover and helps the rest of the project close properly.
Design checks
Four things we confirm before drawing electrical work.
- 01Set lighting, switch and socket positions around how the room will actually be used.
- 02Confirm which kitchen or bathroom appliances need electrical provision.
- 03Coordinate first-fix and second-fix work with plastering, joinery and decoration.
- 04Identify the inspection, testing and completion records required for the job.
Questions
Before you call about Lewisham.
Why plan electrical work before plastering or joinery?
Because the cable routes, boxes and final positions affect the finished surfaces. If the electrical layout is decided early, it is easier to avoid cutting into new work later or settling for sockets and switches that are in the wrong place.
Do all electrical changes belong in the same scope?
No. Lighting, sockets, appliance provision and documentation may all sit within the same project, but they should still be listed clearly. That makes it easier to see what is included and what needs separate specialist input.
What should be checked in a kitchen or bathroom refit?
The electrical provision should match the new layout and any relevant equipment. It is also important to coordinate timing with the other trades so the visible fittings and the hidden routes line up cleanly.
Planning and project guidance
- Lewisham Council - Conservation areas
- GOV.UK · Planning permission
- GOV.UK · Building regulations approval
- GOV.UK · Party walls and building work
Check the current guidance for your address before relying on a planning route. This guide is not a planning decision or a verified local case study.
Other services in Lewisham