City of London · Central London
New buildin Aldgate.
A new home is won or lost in the early decisions. Before anyone talks about finishes, the key questions are where the building sits, how it is accessed and how the design, structure and services will work together from the start.

- Service
- New build
- Neighbourhood
- Aldgate
- Borough
- City of London
- Next step
- Discuss your project
Your project brief
Get the site logic right before the drawing set is fixed
A new build begins with the plot itself: boundaries, access, levels and any physical constraints that affect the footprint or servicing. Those issues shape what can be placed where, how materials reach the site and how the finished home will relate to adjoining land or existing structures.
The internal plan should also respect circulation. A room may be large on paper but still feel compromised if the stairs, corridor or landing arrive in the wrong place. It is better to resolve routeing early than to discover later that the stair position forces awkward room shapes or poor furniture placement.
Aldgate plot checks and City of London starting points
In the City of London, conservation-area guidance is available as a search starting point, with area-specific documents for different parts of the City. That helps inform design, but it does not establish the status of a particular Aldgate site. The exact address still needs checking before assuming any planning route, visual constraint or additional consent issue for a new dwelling.
Design decisions
Coordinate design, structure and services as one package
A sound new-build brief should show how the architectural layout, structural information and services strategy fit together. That means thinking about drainage runs, plant locations, electrical provision, ventilation and structural spans at the same time, rather than asking each trade to solve the others’ problems later.
Because a new dwelling is not an alteration to an existing house, it needs its own site-specific planning route and building-control approach. The right sequence of approvals depends on the plot and the scheme, so a proper survey and design stage are essential before construction is priced or started.
Design checks
Four things we confirm before drawing a new-build home.
- 01Confirm the plot boundaries, access route and service connections before design is fixed.
- 02Align the architectural plan with structural spans, drainage and ventilation strategy.
- 03Set out who handles planning, building-control and any owner or lease consents.
- 04List the completion evidence required, including inspections, test records and as-built information.
Why does circulation matter so much in a new-build layout?
Because the way people move from stair to landing to room determines whether the house feels easy to live in. A layout can meet the area target and still be poor if routes are cramped or if doors clash with everyday use.
What should be agreed before construction starts?
The site constraints, responsibilities for approvals, structural information and the services strategy should all be clear before work begins. That avoids redesign after foundations or walls are underway, when changes are slower and more expensive.
What records are sensible at completion?
Ask for the agreed inspection and test evidence, a list of any outstanding items, and the final as-built information that matches what was actually built. Those records help with future maintenance and with demonstrating what was included in the project.
Planning and project guidance
- Conservation areas - City of London
- GOV.UK · Planning permission
- GOV.UK · Building regulations approval
- GOV.UK · Party walls and building work
Check the current guidance for your address before relying on a planning route. This guide is not a planning decision or a verified local case study.
Other services in Aldgate








