A new build needs more than a good-looking plan. The site, the design and the completion paperwork all have to fit together, especially where the house will sit beside existing boundaries, access routes or services that affect the whole build sequence.

- Service
- New build
- Neighbourhood
- Welling
- Borough
- Bexley
- Next step
- Discuss your project
Your project brief
Check the site first, not last
Before drawings are finalised, the plot needs a proper look at boundaries, access, ground constraints and how materials will reach the site. Those issues influence the building footprint, the position of the house and the temporary work needed during construction. If access is tight, the build method may need to change early rather than halfway through.
The other key point is ownership and responsibility. A new dwelling is not a simple internal alteration, so the planning route has to be site-specific. That means checking the exact plot rather than assuming householder-style rules will apply.
Local checks for a new home in Bexley
Bexley’s planning guidance highlights heritage assets, conservation areas, Article 4 directions, historic parks and gardens, scheduled ancient monuments and archaeological priority areas. Those facts are borough-wide starting points, not proof that every Welling plot is affected. For a new build, the exact address and site history should be checked before design work is treated as settled, because the planning route and any heritage sensitivity are site-specific.
Design decisions
Join the design, structure and services together
A strong new-build brief links structure, drainage, heating, electrics and ventilation from the outset. If these are considered separately, the project can end up with avoidable clashes, awkward plant positions or a layout that is difficult to maintain. Coordinated design is especially important once the floor build-up, openings and service routes are being fixed.
The written scope should also say who is responsible for which approvals, inspections and completion information. That protects the homeowner from discovering late that a key piece of documentation was never planned into the contract.
Design checks
Four things we confirm before drawing a new-build home.
- 01Establish the exact plot boundaries and site access before fixing the design.
- 02Confirm the planning route and building-control responsibilities for the specific site.
- 03Coordinate structure, drainage and services before construction starts.
- 04Agree what drawings, inspections and completion evidence will be provided at handover.
Why does a new build need more site checking than a house refurbishment?
A new build creates the home from the ground up, so boundaries, access, foundations, drainage and service connections all shape the design. Those matters should be checked before construction begins, not solved later when the structure is already in place.
What handover information should I ask for on a new build?
Ask for the final set of drawings, inspection records, test results and completion documents that apply to the works actually carried out. It is also sensible to confirm any outstanding items, snagging arrangements and who to contact if follow-up is needed.
Should planning and building-control responsibilities be written into the contract?
Yes. The contract should say who is handling each approval and what evidence will be supplied when work is complete. That avoids confusion if the project needs revised drawings, inspections or certificates during the build.
Planning and project guidance
- Conservation and Heritage | London Borough of Bexley
- GOV.UK · Planning permission
- GOV.UK · Building regulations approval
- GOV.UK · Party walls and building work
Check the current guidance for your address before relying on a planning route. This guide is not a planning decision or a verified local case study.