A new home is won or lost in the early coordination. Before anything is built, you need a clear answer on the site constraints, the design route, the services strategy and the records that will prove the work was completed properly.

- Service
- New build
- Neighbourhood
- Barbican
- Borough
- City of London
- Next step
- Discuss your project
Your project brief
Start with the plot, access and buildability
A new-build scheme needs the site checked first, not just sketched. Boundaries, access for deliveries, room for working and any neighbouring constraints all shape what can realistically be built. If those basics are unclear, the design can promise a footprint or arrangement that the site cannot support.
It also helps to separate what is known from what still needs investigation. For example, a possible brief might assume a certain plot shape, but the survey, ownership information and site access checks may show that the practical buildable area is different. That is why the first stage should focus on evidence, not assumptions.
Barbican site checks in the City of London
The City of London says it has conservation areas and provides a map and area documents for local reference, including the Barbican and Golden Lane SPD. That is useful starting evidence, but it does not prove a specific plot is restricted in the same way as another. Exact-address checking is still needed before a new-build route is finalised.
Design decisions
Coordinate structure, services and approval responsibilities
A new build is not just a shell; it is a sequence of linked decisions. The structural information, drainage, heating, ventilation, lighting and water services should be coordinated before construction starts, because once the frame and floors are in place, late changes become expensive and awkward.
Planning permission, building regulations approval and any ownership or lease consent are separate matters. The contract scope should state who is handling each route and what documentation is needed at completion, including inspection records and any as-built information. That protects the project from gaps between design intent and finished home.
Design checks
Four things we confirm before drawing a new-build home.
- 01Establish plot boundaries, access and site constraints first.
- 02Coordinate the design, structural information and services strategy together.
- 03Confirm planning and building-control responsibilities before construction.
- 04Define specifications, inspections and completion evidence in the contract scope.
What matters most before the design is fixed on a new home?
The site facts matter most: boundaries, access, constraints and the likely construction route. If those are not settled first, the design can create problems that are difficult to solve later, especially where services and structure need to line up.
Why do approval routes need to be separated in the scope?
Because planning, building regulations and ownership or lease consents are different processes. If they are blurred together, it becomes harder to know who is responsible for each decision and what records are needed before the work can proceed or finish.
What should be handed over at completion?
The handover should include the agreed completion evidence, such as inspection and compliance records relevant to the job, plus any as-built information that helps the homeowner understand what has been installed and where key services run.
Planning and project guidance
- Conservation areas - City of London
- GOV.UK · Planning permission
- GOV.UK · Building regulations approval
- GOV.UK · Party walls and building work
Check the current guidance for your address before relying on a planning route. This guide is not a planning decision or a verified local case study.
Other services in Barbican