A bathroom succeeds when the visible finish and the hidden build-up are planned together. The room’s layout, water and waste routes, waterproofing and ventilation all need to support each other before the tiles and fittings are chosen or installed.

- Service
- Bathrooms
- Neighbourhood
- Hammersmith
- Borough
- Hammersmith and Fulham
- Next step
- Discuss your project
Your project brief
Set the arrangement before the finishes are fixed
The best-looking bathroom still has to work around drainage, plumbing and access. If a bath, shower or basin is moving, the space should be tested against the pipe routes and the room’s clearances before the surface materials are selected.
That helps separate the design of the room from the construction sequence. The desired arrangement is one decision; the order of demolition, plumbing, preparation and finishing is another, and the second needs to support the first.
Hammersmith and Fulham: local checks for a bathroom within a wider project
If the bathroom is part of a larger alteration in Hammersmith and Fulham, check the exact address using the council planning search rather than assuming borough-wide status. The council guidance highlights flood risk zones and some listed or conservation-area situations where extra application information may be needed. Separate those questions from bathroom design itself, and keep party-wall and access matters distinct from the plumbing and waterproofing decisions.
Design decisions
Keep waterproofing, ventilation and lighting in the right order
Bathrooms are vulnerable to hidden problems if the background is not ready. Suitable waterproofing should be specified where needed, and ventilation and lighting should be thought through with the relevant trades so the room works properly after use begins.
The scope should also make clear what happens to the existing room, what gets removed and what is included in making good. That avoids confusion between the suite installation and the work required to prepare the room for it.
Design checks
Four things we confirm before drawing a bathroom installation.
- 01Decide the room layout before choosing sanitaryware.
- 02Confirm drainage, water supply and access to services.
- 03Specify waterproofing and ventilation as separate decisions.
- 04List removal, preparation and making-good in the scope.
Questions
Before you call about Hammersmith.
What should come first in a bathroom project: layout or fittings?
Layout should come first, because the fittings need to suit the available space and the service routes. Once the arrangement is settled, the bath, shower, basin and storage choices can be matched to it.
Why are waterproofing and ventilation so important?
They protect the room behind the tiles and fittings. A bathroom can look finished but still perform badly if moisture is not controlled and the background is not properly prepared.
What should I expect to be listed separately in the scope?
Removal of the old room, plumbing changes, background preparation, waterproofing, tiling, fitting of sanitaryware and final making good should usually be distinguished so each part of the job is clear.
Planning and project guidance
- Planning guidance | London Borough of Hammersmith & Fulham
- GOV.UK · Planning permission
- GOV.UK · Building regulations approval
- GOV.UK · Party walls and building work
Check the current guidance for your address before relying on a planning route. This guide is not a planning decision or a verified local case study.