A new build is decided long before the first visible structure goes up. The important questions are what the site allows, how the rooms will work together and how each stage depends on the one before it, from permissions through to handover evidence.

- Service
- New build
- Neighbourhood
- Hammersmith
- Borough
- Hammersmith and Fulham
- Next step
- Discuss your project
Your project brief
Start with the site, access and boundary picture
A new home should be planned from the ground up, beginning with exact plot boundaries, access for construction and any constraints that affect the layout. Those basics influence where the building can sit, how deliveries arrive and what can be stored on site.
The brief should also identify who is responsible for planning, building control and any specialist reports. A new dwelling cannot rely on householder assumptions, because the route through approvals and technical information has to suit the site and the proposal.
Hammersmith and Fulham: address-specific checks for a new home
Use the Hammersmith and Fulham planning search to check the exact address, because the council’s evidence is site-specific and does not prove the same position for every street. The council’s guidance also says that two thirds of the borough is within a flood risk zone, so a proposal in that zone needs a flood risk assessment. Major schemes may also need drainage and energy information, and the listed or conservation-area triggers for a design and access statement must be checked carefully.
Design decisions
Design the services and structure as one sequence
Room arrangement, structural information and services strategy should be coordinated before construction begins. For example, if the kitchen, bathrooms and plant space all rely on the same service route, that dependency needs to be fixed before finishes are chosen.
The specification should also state inspection points, materials, exclusions and the records expected at completion. That makes it easier to judge whether the build matches the agreed design rather than discovering late changes after lining and decorating have started.
Design checks
Four things we confirm before drawing a new-build home.
- 01Confirm plot boundaries and access before fixing the layout.
- 02Coordinate structure, services and room use in one design sequence.
- 03Agree planning, building-control and specialist-report responsibilities.
- 04Define inspections, specifications and completion records in the scope.
Questions
Before you call about Hammersmith.
What should be settled before the internal layout is finalised?
Plot position, access, boundaries, services strategy and any site constraints should be understood first. Once those are clear, the room plan can be drawn around what the site and approvals can actually support.
How do I keep the build from drifting away from the design?
Tie the contract scope to drawings, specifications, inspection points and completion records. That way the sequence of work is measured against what was agreed, rather than being guided by informal changes made on site.
Why is a new build different from a refurbishment in planning terms?
A new dwelling needs its own site-specific route through planning and technical approvals. It should not be treated as a simple alteration to an existing house, because the starting point is a vacant or reworked site rather than an occupied building.
Planning and project guidance
- Planning guidance | London Borough of Hammersmith & Fulham
- GOV.UK · Planning permission
- GOV.UK · Building regulations approval
- GOV.UK · Party walls and building work
Check the current guidance for your address before relying on a planning route. This guide is not a planning decision or a verified local case study.