A renovation works best when the order of work follows the home’s real constraints, not just the desired end look. The key decisions are what stays, what moves and how the household will live through the changes without disrupting the build more than necessary.

- Service
- House renovation
- Neighbourhood
- Hammersmith
- Borough
- Hammersmith and Fulham
- Next step
- Discuss your project
Your project brief
Set the scope around the building, not just the wish list
Start by separating structural changes, service upgrades and finishes. A new room arrangement may depend on removing a wall, rerouting pipes or improving wiring, so those dependencies need to be understood before any decorative choices are fixed.
That approach helps you avoid finishing work being undone later. It also clarifies which items need specialist input, which parts can be retained and where investigation is needed before the price and sequence are finalised.
Hammersmith and Fulham checks before you lock the programme
For Hammersmith and Fulham, use the council planning search to check the exact address rather than assuming every street is treated the same. The council notes that two thirds of the borough is within a flood risk zone, so a site in that zone needs a flood risk assessment. A design and access statement is only needed in the listed or conservation-area situations the council sets out, and party-wall procedures should be considered before work affecting shared walls begins.
Design decisions
Keep access, storage and daily life in view
Where the household stays in occupation, the route through the home matters as much as the design itself. Retained access, temporary shutdowns of key services and a clear place for materials all need to be allowed for in the written scope.
If there is no practical storage plan, rooms can become congested and finishes can be damaged. A good renovation brief also states exclusions, handover records and any areas that must stay protected while work is underway.
Design checks
Four things we confirm before drawing a house renovation.
- 01Record existing defects and any previous alterations before pricing.
- 02Separate structural changes, service work and decorating in the brief.
- 03Agree how the household, materials and protected areas will be managed.
- 04List approvals, exclusions and handover records before work starts.
Questions
Before you call about Hammersmith.
How do I decide which renovation tasks need to happen first?
Begin with anything that affects structure, services or waterproofing, then move to linings and finishes. If one decision depends on another, it belongs earlier in the sequence, even if it is less visible in the completed room.
What should be included if we are living in the house during the work?
Retained access, waste storage, material deliveries, dust control and the use of kitchens or bathrooms all need thought. The scope should say which parts stay live, which are temporarily closed and how safe movement through the house will work.
How can I avoid choosing finishes before the build details are settled?
Fix the room arrangement, service routes and any structural changes first. Once those are clear, you can choose finishes that suit the actual openings, clearances and junctions rather than designing around assumptions that may later change.
Planning and project guidance
- Planning guidance | London Borough of Hammersmith & Fulham
- GOV.UK · Planning permission
- GOV.UK · Building regulations approval
- GOV.UK · Party walls and building work
Check the current guidance for your address before relying on a planning route. This guide is not a planning decision or a verified local case study.
Other services in Hammersmith