Hammersmith and Fulham · West London
Wraparound extensionin Hammersmith.
A wraparound extension changes more than one wall line, so the design has to be co-ordinated as a single scheme. The main decisions are how much space to keep outside, how the original house will be opened up and how the new layout will work day to day.

- Service
- Wraparound extension
- Neighbourhood
- Hammersmith
- Borough
- Hammersmith and Fulham
- Next step
- Discuss your project
Your project brief
Design the combined footprint as one internal plan
Because side and rear additions interact, the internal layout should be drawn as one plan from the outset. The kitchen, dining area and circulation can then be balanced against the space retained in the garden and the amount of structure needed.
If the brief depends on a particular room arrangement, decide that before choosing finishes. For example, a possible brief might need the cooking area to face one side while seating and storage sit in the rear arm, and that dependency should guide the structure rather than follow it.
Hammersmith checks before confirming the combined scheme
In Hammersmith and Fulham, use the council planning search for the exact address before assuming any flood risk, listed building status or conservation area position. The council guidance also distinguishes between major applications and other proposals for supporting documents such as design and access statements. That makes address-specific checking important for a wraparound extension, because the paperwork follows the site facts, not the borough name alone.
Design decisions
Plan openings, roof junctions and access in sequence
The structural openings, roof junctions and service routes all influence each other in a wraparound scheme. If they are not resolved together, the finished layout can lose flexibility or become harder to build and maintain.
Construction access also matters because materials, waste and trades may need a clear route while the home remains occupied. The temporary site route should be considered alongside the final room arrangement so the project does not create avoidable friction.
Design checks
Four things we confirm before drawing a wraparound extension.
- 01Treat the side and rear addition as one plan, not two separate projects.
- 02Decide the internal room arrangement before selecting finishes or glazing.
- 03Coordinate structural openings, roof junctions and service routes together.
- 04Keep a clear route for household movement and construction access.
Questions
Before you call about Hammersmith.
Why should a wraparound extension be planned as one scheme?
Because the side and rear elements affect each other. The opening positions, roof junctions and kitchen layout all interact, so separate decisions can create wasted corners or force awkward compromises in the final plan.
What should be decided before finishes in a wraparound design?
The structural openings, room sequence and service runs should be settled first. Finishes are easier to choose once you know where the walls, circulation routes and daylight gaps will actually be.
How does access affect the build of a wraparound extension?
Access affects how materials are brought in, where waste goes and how the household continues to move through the property. Planning that route early can make the site setup more workable and reduce clashes between building work and daily use.
Planning and project guidance
- Planning guidance | London Borough of Hammersmith & Fulham
- GOV.UK · Planning permission
- GOV.UK · Building regulations approval
- GOV.UK · Party walls and building work
Check the current guidance for your address before relying on a planning route. This guide is not a planning decision or a verified local case study.
Other services in Hammersmith








