Merton · South London
Bathroomsin Morden.
A bathroom’s layout is never just about where the suite fits. The better question is how the water, waste, waterproofing and ventilation will support the room, because those hidden decisions shape what the finished bathroom can sensibly be.

- Service
- Bathrooms
- Neighbourhood
- Morden
- Borough
- Merton
- Next step
- Discuss your project
Your project brief
Let drainage and services shape the layout early
If you are changing a bathroom, the layout should be tested against the actual route for waste, water and the available space behind the surfaces. Moving a bath or shower may look simple on paper, but the pipe runs, floor build-up and access for maintenance can all alter the best arrangement.
This is why bathroom design should be tied to the room’s real constraints. A shower position, basin choice or toilet location can affect where boxing, access panels or floor alterations are needed. The aim is not to squeeze in more items, but to make the room work cleanly and remain serviceable.
Morden checks before a bathroom refurbishment
Merton’s conservation information is relevant only if the bathroom project forms part of a wider change that affects the exterior or the building’s character. The council says some areas have extra planning controls and that exact addresses should be checked individually. For the bathroom itself, the most important choices are the layout, service routes and the right background for a durable finish.
Design decisions
Build the finish on top of the right background
Bathroom surfaces have to deal with moisture, so the hidden layers matter as much as the tiles and fittings. Suitable backgrounds, waterproofing and tiling should be considered together, especially around showers and other wet areas, so the room does not rely on cosmetics to solve a protection problem.
Ventilation and lighting also need to be part of the same conversation. A bathroom that looks good but steams up or feels awkward to use has not been properly designed. If the room is part of a wider refurbishment, the sequence should make sure the bathroom is complete before final decorating or floor finishing elsewhere begins.
Design checks
Four things we confirm before drawing a bathroom installation.
- 01Removal of the existing bathroom and preparation within an agreed refurbishment scope.
- 02Sanitaryware, showers, baths and taps, coordinated with water and waste connections.
- 03Suitable backgrounds, waterproofing systems and tiling where specified.
- 04Ventilation, lighting and finishing work coordinated with the relevant trades.
What matters most when reworking a bathroom layout?
Drainage, water supply and the room’s usable space. The best layout is the one that fits the services and remains practical to maintain, not just the one that packs in the most fittings.
Why do waterproofing and tiling need to be considered together?
Because the tiles are only the visible layer. The hidden background must already be suitable for wet conditions, otherwise the finished room may look fine but perform poorly over time.
Should lighting and ventilation be planned separately from the suite?
No, they should be part of the same design conversation. They affect comfort, moisture control and how the room functions, so leaving them until last can limit the layout options.
Planning and project guidance
- Conservation areas | Merton Council
- GOV.UK · Planning permission
- GOV.UK · Building regulations approval
- GOV.UK · Party walls and building work
Check the current guidance for your address before relying on a planning route. This guide is not a planning decision or a verified local case study.
Other services in Morden







