A new home is not just a blank design exercise. It depends on the plot, access, servicing and the approval route as much as the room schedule. The key decision is how to turn a site-specific brief into a buildable proposal with the right information in place from the start.

- Service
- New build
- Neighbourhood
- Chelsea
- Borough
- Kensington and Chelsea
- Next step
- Discuss your project
Your project brief
Establish the plot before the design hardens
For a new build, the first task is to understand the exact plot boundaries, how the site can be reached and what constraints affect construction access. That includes enough clarity for setting out, deliveries and safe working space, because these practicalities shape the design as much as the appearance of the finished home.
A useful survey may also reveal issues drawings cannot: level changes, boundary ambiguities, existing services, drainage positions or restrictions on where work can physically happen. The design team should use those findings to avoid assumptions that later disrupt planning, engineering or the build sequence.
Chelsea address checks for a new dwelling
In Chelsea, do not rely on borough-wide generalities when deciding what can be built. Kensington and Chelsea provides conservation-area information and planning guidance, but the exact address still has to be checked for any special designation, policy sensitivity or article 4 issue. If the plot is within a protected area or subject to additional controls, that must be built into the site strategy before the design is fixed.
Design decisions
Write the brief so responsibilities are clear
The contract scope should explain who is responsible for planning, building control, structural information and the services strategy, rather than bundling everything together. That is especially important on a new dwelling, where permitted-development assumptions for householder work do not apply in the same way and the route must be tailored to the site.
It is also wise to record what is provisional. For example, if the foundations, drainage diversion or utility connections are not yet fully confirmed, the scope should say so. Clear assumptions help prevent disputes over whether an item was included, omitted or left for later design development.
Design checks
Four things we confirm before drawing a new-build home.
- 01Confirm plot boundaries, access and any site constraints from a survey.
- 02Coordinate the architecture, structure and services strategy together.
- 03Clarify the planning and building-control route before construction starts.
- 04Define specifications, inspections and completion evidence in the scope.
What makes a new build different from a major renovation in planning terms?
A new home needs a site-specific route and cannot rely on householder assumptions used for alterations to an existing dwelling. The design, approvals and supporting information all need to be based on the plot and the proposal as a whole.
Why should access be studied so early?
Because access affects deliveries, scaffolding, excavation, welfare space and how much of the site can be worked on safely. If access is tight, the design and construction method may need to change before drawings are finalised.
What belongs in completion evidence?
The scope should say what records are needed at handover, such as as-built information, inspection sign-offs and the documents required for the completed home. That avoids confusion about what proof is expected when the build is finished.
Planning and project guidance
- Conservation areas | Royal Borough of Kensington and Chelsea
- GOV.UK · Planning permission
- GOV.UK · Building regulations approval
- GOV.UK · Party walls and building work
Check the current guidance for your address before relying on a planning route. This guide is not a planning decision or a verified local case study.