Kensington and Chelsea · Central London
Plasteringin Chelsea.
Good plastering starts with the surface behind the finish. A wall that looks ready may still be loose, uneven or patched in a way that affects the final result. The right choice is often between a small repair, new boarding or a fuller system that matches the background.

- Service
- Plastering
- Neighbourhood
- Chelsea
- Borough
- Kensington and Chelsea
- Next step
- Discuss your project
Your project brief
Choose the method to suit the background
If the existing wall or ceiling is sound, a targeted repair may be enough. But if the substrate is unstable, badly uneven or disturbed by previous work, a thin finish alone will not solve the issue. The material choice should follow the condition of the background, not the other way round.
That is why a survey matters before any price or programme is fixed. It helps show whether there is loose material, old cracking, damp staining or an opening-up area that needs more than cosmetic attention. The aim is to agree the right level of intervention for the room.
Chelsea survey checks before plastering starts
For Chelsea properties, the address should be checked for any conservation-area or other local planning sensitivity only where relevant to the wider works, not assumed from the neighbourhood name alone. Kensington and Chelsea’s guidance notes that conservation-area status does not stop change, but it can affect proposals that alter character. For interior plastering, the key is still the building’s condition and the exact scope of the room works.
Design decisions
Keep repairs and making good separate from decoration
Plastering often happens after structural alterations, rewiring or pipework changes, when walls have been opened and need rebuilding. The scope should say which areas are being made good, where new boards are needed and what finish is expected. That prevents the decoration stage from being asked to hide problems it cannot properly cover.
For example, if a room has patchwork repairs around a doorway or pipe chase, the plastering may need to include levelling and junction work before the finishing coat goes on. Listing those tasks clearly helps the client understand what is structural making-good and what is simply surface finishing.
Design checks
Four things we confirm before drawing plastering work.
- 01Check for loose material, cracking and uneven backgrounds.
- 02Decide whether the job needs patch repair, boarding or a fuller system.
- 03Separate plastering from later decoration in the written scope.
- 04Agree where openings, reveals and junctions will be made good.
When is plasterboard a better choice than repairing the existing wall finish?
When the background is too irregular, unstable or damaged for a reliable finish. New boarding can provide a better base, especially after alterations or services work, but the survey should confirm that it is the right solution.
Why does a ceiling need the same level of checking as a wall?
Because ceiling defects can be hidden until finishes are stripped back. Movement, previous repairs or old service openings can affect how well the plaster bonds and how much preparation is needed before finishing.
What should be recorded if only part of a room is being replastered?
Note the exact limits of the work, the areas to be left untouched and any matching or feathering needed at the joins. That keeps the scope clear and avoids confusion when decoration begins.
Planning and project guidance
- Conservation areas | Royal Borough of Kensington and Chelsea
- GOV.UK · Planning permission
- GOV.UK · Building regulations approval
- GOV.UK · Party walls and building work
Check the current guidance for your address before relying on a planning route. This guide is not a planning decision or a verified local case study.
Other services in Chelsea







