A bathroom has to work long after the visible finishes are installed. In Kensington, the key decision is how the layout, drainage, waterproofing and ventilation will support daily use, while the scope keeps the hidden work and finish work properly apart.

- Service
- Bathrooms
- Neighbourhood
- Kensington
- Borough
- Kensington and Chelsea
- Next step
- Discuss your project
Your project brief
Design the bathroom from the inside out
A bathroom design should start with use: showering, bathing, storage and how people move around the room. If, for example, the basin, shower or bath is being relocated, the water and waste routes need checking before the final layout is fixed, because hidden services can shape the whole room.
A survey should reveal what the drawings cannot, including the condition of the existing room, previous alterations and any limits on access. Those findings should be written into the brief so assumptions about walls, floors and pipe routes are clear before the room is stripped out.
Kensington address checks before a bathroom refit
For Kensington, the local check is to verify the individual address rather than rely on the borough name. Kensington and Chelsea’s planning pages state that much of the borough lies within conservation areas, and the council’s map is the proper way to confirm a property. That is relevant if a bathroom project forms part of a wider scheme that changes the exterior or other character-sensitive features. Internal bathroom work is a separate matter, but the wider context should still be checked.
Design decisions
Protect the surfaces behind the tiles and fittings
Bathrooms fail when the work behind the visible finish is rushed. Suitable backgrounds, waterproofing and ventilation all matter, especially where moisture could travel into adjacent or lower rooms. The scope should specify what is being prepared, what materials are being used and where the waterproofing detail is intended to stop.
The rooms below or beside the bathroom should also be considered, because leaks, access for pipework and temporary loss of use can all affect them. The project should include the right sequence for plumbing, tiling and finishing, with the handover records and responsibility for specialist tasks defined in advance.
Design checks
Four things we confirm before drawing a bathroom installation.
- 01Check drainage, water supply and access before confirming the layout.
- 02Confirm the background, waterproofing and ventilation approach in the scope.
- 03Separate sanitaryware installation from the surrounding finishing work.
- 04Record how the nearby rooms or lower rooms may be affected during the job.
Questions
Before you call about Kensington.
What does a bathroom survey need to uncover?
It should show the condition of the room, the likely service routes, any previous alterations and any access limitations. That tells you whether the proposed layout is straightforward or needs rethinking before work begins.
Why are lower rooms important in a bathroom project?
Because leaks, pipe routes and waterproofing issues can affect spaces below. Considering them early helps the design and build sequence reduce risk rather than reacting after damage appears.
Should tiling and plumbing be part of the same brief?
Yes, at least in the coordination sense. They are different tasks, but they depend on each other. The scope should say how the plumbing, waterproofing and tiling sequence will be managed.
Planning and project guidance
- Conservation areas | Royal Borough of Kensington and Chelsea
- GOV.UK · Planning permission
- GOV.UK · Building regulations approval
- GOV.UK · Party walls and building work
Check the current guidance for your address before relying on a planning route. This guide is not a planning decision or a verified local case study.