Kensington and Chelsea · Central London
New buildin Kensington.
A new build succeeds when the site, design and approvals are aligned from the start. In Kensington, the main decision is how to test the plot properly, then build a specification that reflects access, constraints and the records needed to close the project cleanly.

- Service
- New build
- Neighbourhood
- Kensington
- Borough
- Kensington and Chelsea
- Next step
- Discuss your project
Your project brief
Turn the plot into a tested project brief
A new home cannot rely on generic drawings. The site boundary, access, neighbouring relationships and any physical constraints all need checking before the design is finalised. The brief should say what has been confirmed on site and what still depends on further investigation.
That matters because early assumptions about levels, drainage, utility connections or retaining needs can change the entire scheme. If, for example, the plot has limited access, the method of construction and delivery sequence may need to be planned before the structure is drawn in detail.
Kensington address checks for a new home
For Kensington, local checks must start with the exact site rather than the borough name alone. Kensington and Chelsea’s planning pages say the borough contains many conservation areas, and the council provides maps and appraisal documents to help assess individual properties. That helps with early planning judgement, but it does not prove the same rules apply to every street or plot. A site-specific check is essential before the route for a new dwelling is fixed.
Design decisions
Coordinate structure, services and approvals before work begins
The structure, drainage, ventilation, electrics and water services should not be treated as separate afterthoughts. A new build needs these elements to work together so the house can be built, inspected and completed in the right order. The scope should identify who is responsible for each design package and when approvals are needed.
Planning and building control are distinct steps, and ownership or lease consent may also be relevant. The contract scope should also list the inspections, tests and completion evidence expected at handover, so the project finishes with a clear record rather than a collection of loose papers.
Design checks
Four things we confirm before drawing a new-build home.
- 01Confirm plot boundaries, access and any obvious site constraints before design freezes.
- 02Coordinate the structure with drainage, ventilation and services from the outset.
- 03Set out which permissions, consents and building-control steps are needed for the site.
- 04Write the contract to include inspections, test records and completion evidence.
Questions
Before you call about Kensington.
What can drawings miss on a new-build site?
They may miss ground conditions, access limits, neighbouring constraints, utility positions and how the site will actually be built out. A site survey and early design coordination are what turn a concept into a workable scheme.
Why should assumptions be written into the brief?
Because a new build can change quickly if an assumption proves wrong. A written assumption makes it clear what is provisional, what must be checked, and what may affect cost, programme or approval later.
What records should be expected at completion?
The scope should identify the handover evidence needed for the project, such as inspection records, test results and any product or installation information agreed in advance. The exact list depends on the design and the specialists involved.
Planning and project guidance
- Conservation areas | Royal Borough of Kensington and Chelsea
- GOV.UK · Planning permission
- GOV.UK · Building regulations approval
- GOV.UK · Party walls and building work
Check the current guidance for your address before relying on a planning route. This guide is not a planning decision or a verified local case study.