Electrical planning is easiest when it happens before plastering, joinery and cabinet installation. The right number and position of points depends on how the room will be used, so the layout, furniture and appliances should guide the electrical brief from the beginning.

- Service
- Electrical work
- Neighbourhood
- Notting Hill
- Borough
- Kensington and Chelsea
- Next step
- Discuss your project
Your project brief
Set the room around use, not just around fixtures
Socket positions, switches and lighting should support daily routines. If a seating area, desk or kitchen zone is planned, the electrical points need to align with that use. A room can have enough fittings on paper and still feel inconvenient if the layout was not thought through properly.
For example, a possible brief might need extra sockets where furniture will sit and a different lighting layout where tasks happen. Those choices should be made before walls are finished, because moving points later is more disruptive than agreeing the plan at the right stage.
Local checks for electrical work in Kensington and Chelsea
The borough’s planning information is relevant if electrical changes are part of a wider alteration affecting the building’s character or external appearance. Kensington and Chelsea also says some properties may be within conservation areas or subject to removed permitted development rights, so check the exact property rather than assuming the neighbourhood route. Internal electrical work is usually a coordination issue first, but site-specific checks still matter where the project is broader.
Design decisions
Keep specialist needs and documentation in view
Electrical work in a refurbishment is often linked to other trades. First-fix and second-fix stages should be coordinated with plastering, cabinetry and final decoration. That avoids opening finished surfaces just to move a point that could have been positioned earlier.
The scope should also identify any required inspection, testing or completion records within the installation package, without assuming who is providing what until it is agreed. If a kitchen or bathroom is involved, the electrical plan should be coordinated with that room’s equipment and the rest of the build.
Design checks
Four things we confirm before drawing electrical work.
- 01Map sockets and switches to the room’s actual furniture and activity zones.
- 02Confirm lighting positions before plastering or joinery closes the walls.
- 03Coordinate first-fix and second-fix with the rest of the refurbishment.
- 04Identify any inspection, testing or completion records needed for the scope.
Questions
Before you call about Notting Hill.
Why should sockets be planned before furniture is ordered?
Because furniture layout determines where points are useful or blocked. If you plan sockets after the room is fitted out, you may end up with inconvenient positions or need additional work to make the room practical.
What is the benefit of separating first-fix and second-fix?
It makes sequencing clearer. First-fix is the hidden cabling and preparation, while second-fix is the visible installation and connection stage. Keeping them separate helps the rest of the project plan around them.
Do I need the final lighting layout before walls are finished?
Ideally, yes. Lighting positions often affect ceiling and wall preparation, so deciding them early reduces rework. Even if details change later, having the main layout agreed before finishing starts saves disruption.
Planning and project guidance
- Conservation areas | Royal Borough of Kensington and Chelsea
- GOV.UK · Planning permission
- GOV.UK · Building regulations approval
- GOV.UK · Party walls and building work
Check the current guidance for your address before relying on a planning route. This guide is not a planning decision or a verified local case study.