Electrical planning is easiest before plaster and cabinetry go in. In Reigate, the useful decisions are where the room will need light and power, what the equipment will draw and what specialist input or records the job will need once the work is complete.

- Service
- Electrical work
- Town / city
- Reigate
- County
- Surrey
- Next step
- Discuss your project
Your project brief
Set lighting and socket positions to match real use
A room’s layout should drive the electrical plan. If the kitchen needs task lighting, or a bedroom needs charging points near the bed, those positions are better decided before the walls are closed and the furniture is fixed. Otherwise the room may function awkwardly even if the wiring is technically correct.
The existing condition of the wiring also matters. If cables, protective devices or circuit capacity are not suitable, the scope may need to include more than a simple swap of fittings. Attractive fixtures alone do not prove the installation is appropriate for the load or the room’s use.
Reigate local check before external or roof-adjacent electrical changes
Reigate and Banstead says older appraisal boundaries may not be current and directs owners to the live heritage map. If electrical work is part of a wider alteration affecting the exterior or roofline, check the exact address first. The council also notes that linked character appraisals are drafts approved for consultation, so they can explain context but do not replace the current planning framework.
Design decisions
Build in the checks and paperwork that belong with the work
Electrical work should be coordinated with the wider build, especially when plastering, kitchen fitting or bathroom work is taking place. First-fix and second-fix stages need to be timed so accessories do not get installed only to be moved again later.
Applicable Building Regulations requirements, including Part P where relevant, and any notification route should be confirmed for the specific job. The scope should also identify what inspection, testing and documentation will be needed, rather than leaving that to the end as an afterthought.
Design checks
Four things we confirm before drawing electrical work.
- 01Plan lighting, switches and sockets around how the room will be used.
- 02Check circuit capacity, cable condition and protection before finalising the scope.
- 03Coordinate first-fix and second-fix work with the other trades.
- 04Confirm the relevant inspection, testing and notification route for the job.
Questions
Before you call about Reigate.
Why should electrical decisions happen before plastering and cabinets are fitted?
Because cable routes, socket positions and switch heights are much easier to agree before surfaces are closed. Changing them later usually means more disruption and extra making-good.
What should be checked for a kitchen or bathroom electrical layout?
The room’s use, the appliance load, the cable condition and the suitable location for fittings. Wet areas and high-demand appliances need especially careful planning, not just a convenient socket position.
Is the finish of a fitting enough to judge whether the electrical work is suitable?
No. The important issues are the installation design, the circuit arrangement and the required checks. A neat-looking fitting still needs to suit the room and comply with the proper process.
Planning and project guidance
- Reigate and Banstead · current conservation boundaries and appraisal status
- GOV.UK · Planning permission
- GOV.UK · Building regulations approval
- GOV.UK · Party walls and building work
Check the current guidance for your address before relying on a planning route. This guide is not a planning decision or a verified local case study.
Other services in Reigate