A new-build home is not just another building job. The early decisions in Reigate are about the plot, the approval route and the services strategy, because those choices determine what can be built, how it will connect to the site and what evidence will be needed at the end.

- Service
- New build
- Town / city
- Reigate
- County
- Surrey
- Next step
- Discuss your project
Your project brief
Confirm the plot before drawing the house
The starting point is the site itself: boundaries, access, levels and the practical constraints that affect siting and construction. If those are unclear, the design can drift into a plan that looks good on paper but does not fit the land, neighbours or service connections.
A new dwelling also needs a site-specific planning route. It should not be treated like a householder extension, because the approvals, supporting information and responsible parties are different from an alteration to an existing house.
Reigate checks that should happen before the plot is priced
Reigate and Banstead advises owners to use the live heritage map and warns that older appraisal boundaries may be out of date. For a new build near a sensitive edge, that means checking the exact address and not relying on a historic plan. The council also describes related character appraisals as drafts approved for consultation, so they can inform design but do not replace the current planning framework for the application.
Design decisions
Design the build around services and sign-off from day one
The structural design, drainage approach and utility strategy should be coordinated before the foundations are agreed. If the kitchen, bathrooms or plant spaces depend on particular service routes, those should be shown early so the shell, floors and internal partitions do not have to be reworked later.
The contract scope should also name inspections and completion evidence. That way the finished house is supported by the documents needed to show what was built, what was checked and what remains the occupier’s responsibility after handover.
Design checks
Four things we confirm before drawing a new-build home.
- 01Establish plot boundaries, access and site constraints first.
- 02Coordinate the design, structural information and services strategy together.
- 03Confirm planning and building-control responsibilities before building starts.
- 04Set out specifications, inspections and completion evidence in the contract scope.
What makes a new build different from an extension in planning terms?
A new dwelling is a separate development decision, so it needs its own site-based planning route and supporting design information. It should not rely on the assumptions used for altering an existing house.
Why are boundaries and access so important at the start?
Because they affect where the house can sit, how materials can be brought in and where drainage or utilities may run. If these are uncertain, later design changes can become expensive and disruptive.
What should be included in completion evidence for a new build?
The scope should identify the drawings, inspection records, product information and any certificates or completion documents that apply to the work. That gives the owner a clear record of what was built and how it was checked.
Planning and project guidance
- Reigate and Banstead · current conservation boundaries and appraisal status
- GOV.UK · Planning permission
- GOV.UK · Building regulations approval
- GOV.UK · Party walls and building work
Check the current guidance for your address before relying on a planning route. This guide is not a planning decision or a verified local case study.