Greenwich · South London
Bathroomsin Woolwich.
A bathroom has to perform properly long after the suite is fitted. The useful decisions are about layout, drainage, waterproofing, ventilation and the way the room connects to the rest of the home, not just how many fittings it contains.

- Service
- Bathrooms
- Neighbourhood
- Woolwich
- Borough
- Greenwich
- Next step
- Discuss your project
Your project brief
Let the service layout shape the room design
Bathroom servicing affects layout in a way that people often underestimate. The position of the bath, shower, basin and toilet influences water supply, waste routes, flooring build-up and how much hidden work is needed behind the walls and floor.
If the room is being reconfigured, the best layout may be the one that keeps the services manageable and the room easier to maintain. For example, a possible brief might move the basin or shower only where the drainage and waterproofing details can still be made reliable.
Woolwich bathroom checks in Greenwich
Greenwich’s planning guidance says to check permission before starting building work, and it flags flats, maisonettes, listed buildings, conservation areas and Article 4 directions as cases needing closer review. A bathroom refit is often internal, but the exact property status still matters if the job is part of a wider alteration or involves a listed building.
Design decisions
Treat the room as a whole system
A bathroom should be planned as a set of linked decisions: removal, pipework, backgrounds, finishes, ventilation and lighting. If one of those parts is ignored, the room may look complete but still fail in use.
It also helps to separate the visible suite from the supporting work. Waterproofing, tiling and finishing should follow the underlying service and substrate decisions, so the final room is not relying on cosmetic work to hide poor sequencing.
Design checks
Four things we confirm before drawing a bathroom installation.
- 01Confirm the bathroom layout before pricing plumbing and waterproofing.
- 02Check drainage, water provision and ventilation together.
- 03Separate the visible suite from the supporting background and finish work.
- 04Agree who will coordinate the trades if the room is part of a larger refurbishment.
Why does a bathroom layout matter beyond the number of fittings?
Because the layout determines service routes, waterproofing details and how easy the room is to use. Two bathrooms with the same fittings can still need very different work if the arrangements are different.
Should bathroom waterproofing be decided before tiling?
Yes, because the tiling depends on the background and the waterproofing system underneath it. The surface finish should follow the technical plan, not replace it.
What if I want to keep most of the existing bathroom position?
That can simplify the job, but the existing pipework, waste routes and room condition should still be checked. Retaining the layout only works well if the background and services remain suitable.
Planning and project guidance
- Find out if you need planning permission | Royal Borough of Greenwich
- GOV.UK · Planning permission
- GOV.UK · Building regulations approval
- GOV.UK · Party walls and building work
Check the current guidance for your address before relying on a planning route. This guide is not a planning decision or a verified local case study.
Other services in Woolwich







