A good renovation plan starts with what the house already gives you, not with the finish you want to see last. In Woolwich, that means checking the existing building, the proposed changes and the practical impact on day-to-day living before any room is closed up.

- Service
- House renovation
- Neighbourhood
- Woolwich
- Borough
- Greenwich
- Next step
- Discuss your project
Your project brief
Set the scope around the building, not just the room list
House renovation works best when the structure, services and finishes are separated from the start. If you are opening rooms together, moving a bathroom or kitchen, or altering walls and ceilings, each part needs its own design decision and its own approval route if required.
That approach helps avoid the common problem of paying for visible work before the hidden issues are dealt with. For example, a possible brief might involve repair to a damaged wall, a new pipe run and a fresh finish, but those are three different decisions rather than one lumped-together task.
Woolwich and Greenwich checks before you commit
Greenwich says you should check whether planning permission is needed before starting building work, especially where the external appearance of a building changes, a house is extended, or a flat or maisonette is involved. The council guidance also notes that listed buildings, conservation areas and Article 4 directions can affect what is allowed. Exact address matters, so use the council’s planning route for the specific property rather than assuming the whole neighbourhood has the same rules.
Design decisions
Protect the home while work is underway
Renovation also needs a practical plan for living through the job. Access, dust control, temporary services and the order of work can matter as much as the final layout, especially where kitchens or bathrooms are being altered and the home still needs to function.
It is also worth being clear about exclusions. If the job may reveal rot, old alterations or unsafe service routes, the written scope should say how that will be inspected, priced and agreed before the work moves on.
Design checks
Four things we confirm before drawing a house renovation.
- 01Record existing defects and previous alterations before drawing up the renovation scope.
- 02Separate structural changes, service upgrades and decorative work into different decisions.
- 03Plan how the home will stay usable, including access, dust and temporary services.
- 04Agree investigations, approvals, exclusions and handover records in writing.
Questions
Before you call about Woolwich.
How should I decide what to renovate first in a lived-in house?
Start with defects, safety and the parts that unlock the rest of the job, such as walls, services and access. Decorative choices come later, once the building issues and room layout are settled and priced.
Why separate plumbing, electrics and finishes in one renovation scope?
Because they affect each other. Hidden service work may change wall build-ups, floor levels and how long rooms stay out of use, so it is clearer and safer to define them separately before the surface finishes are fixed.
What matters most if the renovation includes a kitchen or bathroom?
The layout needs to suit the services, not the other way round. Water, waste, electrics and ventilation can all affect where fittings can sensibly go, so the room plan should be checked before ordering cabinets or sanitaryware.
Planning and project guidance
- Find out if you need planning permission | Royal Borough of Greenwich
- GOV.UK · Planning permission
- GOV.UK · Building regulations approval
- GOV.UK · Party walls and building work
Check the current guidance for your address before relying on a planning route. This guide is not a planning decision or a verified local case study.