Greenwich · South London
Kitchensin Woolwich.
A kitchen works best when the room plan reflects how you actually use it. Cooking, storage, dining and circulation all affect the right layout, and the plumbing, electrics and finishes should be coordinated around that decision rather than added later.

- Service
- Kitchens
- Neighbourhood
- Woolwich
- Borough
- Greenwich
- Next step
- Discuss your project
Your project brief
Plan the room around use, not just unit count
A kitchen is not simply a row of cabinets. The best layout depends on how often the room is used, whether it needs space for eating, and how people move through it. That is why cabinet positions, appliance zones and working space should be decided before the installation starts.
If the room is also being opened up or rebuilt, the kitchen plan may change the building work itself. For example, a possible brief might keep the sink near an existing service point while shifting storage and seating to make the circulation better.
Woolwich checks before a kitchen project begins
Greenwich’s guidance says to find out if planning permission is needed before starting building work, and it flags flats, maisonettes, listed buildings, conservation areas and Article 4 directions as situations that may require closer checking. A kitchen fit itself is often internal, but any wider alteration should be checked against the exact property address rather than assumed from the area name alone.
Design decisions
Match the kitchen to the building work behind it
The visible kitchen is only part of the job. Walls and floors may need preparation, plumbing may need altering, and electrical positions should be checked before the units go in. If those elements are not coordinated, the final fit can become awkward or overly adapted on site.
It helps to separate removal, making good, installation and connections in the scope. That way it is clear whether the job includes the units only, or also the wider work needed to make the room function properly.
Design checks
Four things we confirm before drawing a kitchen installation.
- 01Decide how the room will be used before choosing the layout.
- 02Check plumbing, electrics and floor or wall preparation before ordering units.
- 03Separate kitchen removal, installation and final connections in the scope.
- 04Allow for measuring and fitting work to follow the chosen layout, not the other way round.
How does a kitchen layout affect the rest of the home improvement work?
The layout affects services, flooring and sometimes wall changes. Once the sink, appliances and storage positions are fixed, the surrounding building work can be planned to suit those decisions instead of being adjusted afterwards.
Why distinguish cabinetry from plumbing and electrical work?
Because they are different trades with different decisions. Cabinets can be fitted only when the service positions, appliance needs and room preparation are already understood, otherwise the final kitchen may not function well.
What if I want a kitchen refresh rather than a full replacement?
Then the scope should say which parts are retained and which are changed. A refresh might involve new doors, worktops or finishes, but the room still needs checking for any plumbing or electrical adjustments that the new layout requires.
Planning and project guidance
- Find out if you need planning permission | Royal Borough of Greenwich
- GOV.UK · Planning permission
- GOV.UK · Building regulations approval
- GOV.UK · Party walls and building work
Check the current guidance for your address before relying on a planning route. This guide is not a planning decision or a verified local case study.
Other services in Woolwich







