Greenwich · South London
Plumbingin Woolwich.
Plumbing is rarely just about moving a fitting from one wall to another. If you are changing a kitchen or bathroom, the layout has to work with pipe routes, drainage and access to the system, not just the look of the room.

- Service
- Plumbing
- Neighbourhood
- Woolwich
- Borough
- Greenwich
- Next step
- Discuss your project
Your project brief
Let the layout follow the services
When a sink, shower or toilet moves, the pipework and waste routes may need to move as well. That can affect floor build-up, boxing-in and the amount of wall or floor opening needed. The best layout is the one that is practical to install and maintain, not only the one that looks neat on paper.
For example, a possible brief might be to move a basin within the same room while keeping the main drainage route short and accessible. That may be easier than forcing a layout that creates awkward service runs behind finished surfaces.
Greenwich planning checks for plumbing-related changes
Greenwich advises checking planning permission before building work, particularly if the project alters the external appearance or involves a flat, maisonette, listed building, conservation area or Article 4 direction. Plumbing inside a room may not itself trigger permission, but if it forms part of a wider alteration, the exact property address and status still need to be checked.
Design decisions
Separate first-fix and second-fix decisions
Plumbing work often has two different stages. The first stage deals with pipe routes and hidden connections, while the second stage covers the visible fittings and final connections. Keeping those separate makes it easier to coordinate with tiling, cabinetry and decorating.
It also helps to agree how existing pipework will be assessed. Some systems can be reused, others need replacement or alteration, and that choice should be made after inspection rather than assumed from the room plan alone.
Design checks
Four things we confirm before drawing plumbing work.
- 01Set out the proposed kitchen or bathroom layout before pipework is priced.
- 02Check water supply, waste routes and access to existing pipework.
- 03Decide what is first-fix work and what is second-fix work.
- 04Agree who will inspect, test and document the altered system.
Why does moving a sink or basin change the plumbing scope so much?
Because the new position may change the supply route, waste fall and access for maintenance. A small visual change can mean a bigger hidden change, so the layout needs checking before the room is fixed in place.
Should plumbing be agreed before cabinets or tiles are ordered?
Yes, especially in kitchens and bathrooms where service positions affect everything else. Once the plumbing layout is fixed, the rest of the room can be measured and coordinated with more confidence.
What if old pipework is still hidden in the wall or floor?
That needs to be checked as part of the scope. Accessible pipework may be reusable, but hidden sections should be investigated so the new work is not built around a system that cannot support the layout.
Planning and project guidance
- Find out if you need planning permission | Royal Borough of Greenwich
- GOV.UK · Planning permission
- GOV.UK · Building regulations approval
- GOV.UK · Party walls and building work
Check the current guidance for your address before relying on a planning route. This guide is not a planning decision or a verified local case study.
Other services in Woolwich







