A new-build home is decided long before the shell goes up. The key choices are site boundaries, access, services, approvals and how the finished house will be documented. Get those right early and the build is easier to sequence and sign off.

- Service
- New build
- Neighbourhood
- Woolwich
- Borough
- Greenwich
- Next step
- Discuss your project
Your project brief
Start with the site, not the plan shape
A new home needs a site-specific approach from the outset. Boundary positions, access for delivery and construction, and any constraints on the plot all affect what can be built and how it can be built. That is why a survey and design check come before final room layout.
If the plot has awkward access or limited room for storage, those practical limits can influence the footprint, the construction sequence and the service routes. A possible brief might include a compact service core or a different room arrangement to make the build workable.
Woolwich site checks in Greenwich
Greenwich advises checking planning permission before starting work, and it specifically flags new buildings as the kind of project that may need permission. The council also points homeowners to building control where structural changes or new properties are involved. Because council guidance is not the same as a site decision, the exact address and status of the plot still need to be checked before the route is fixed.
Design decisions
Build the service strategy into the design
New builds work best when structure, drainage, water, electrics and heating are planned together. That helps avoid last-minute changes once walls, floors and ceilings are fixed in place. It also gives a clearer picture of what needs to be inspected and when.
Planning permission and building control are separate matters, and both need checking against the actual site and design. Ownership, lease consent and any party-wall process are also separate from the technical build plan, so they should be resolved in parallel rather than assumed.
Design checks
Four things we confirm before drawing a new-build home.
- 01Establish plot boundaries, access and any site constraints before design is finalised.
- 02Coordinate the structure, drainage, utilities and room layout as one system.
- 03Confirm planning, building-control and consent responsibilities before construction starts.
- 04Define specifications, inspections and completion records in the contract scope.
What should be settled before finalising a new-build layout?
The plot dimensions, access, service connections and any constraints should come first. Once those are known, the room arrangement and structural approach can be coordinated instead of being redesigned during construction.
Why does a new build need more than a room-by-room design brief?
Because every part of the house depends on the same site and service strategy. The drainage, structure, utilities and completion records all need to line up, so the brief has to cover the whole project, not just the floor plan.
How do bathroom and kitchen choices affect a new build?
They affect the service core, pipe routes and ventilation. If those rooms move even slightly, the design of adjacent spaces may also change, so their locations should be checked alongside the whole-house layout.
Planning and project guidance
- Find out if you need planning permission | Royal Borough of Greenwich
- GOV.UK · Planning permission
- GOV.UK · Building regulations approval
- GOV.UK · Party walls and building work
Check the current guidance for your address before relying on a planning route. This guide is not a planning decision or a verified local case study.