Greenwich · South London
Bathroomsin Greenwich.
A bathroom is only as good as the work hidden behind the tiles and fittings. Before choosing the suite or surface finish, it is worth deciding how drainage, waterproofing and ventilation will support the room and what impact the work will have on adjoining spaces.

- Service
- Bathrooms
- Neighbourhood
- Greenwich
- Borough
- Greenwich
- Next step
- Discuss your project
Your project brief
Treat layout and services as one decision
Changing a bathroom layout is not just about moving the bath or basin. The waste route, supply positions and wall build-ups all influence where the fittings can go. That can affect the room below if pipework or new access points need to be created through floors or ceilings.
A proper brief should say whether the existing room is being stripped back, repaired or fully replaced. If old finishes stay in place, the new work has to meet them cleanly; if everything comes out, the sequence of making good becomes part of the job rather than a surprise at the end.
Greenwich checks before bathroom refurbishment
Greenwich’s planning guidance covers permissions for certain home projects, while building control may be relevant where structural changes are involved. A bathroom refurb inside an existing home is not automatically a planning issue, but address-specific checking still matters if the works form part of a wider alteration or if the property has special controls such as listed status or an Article 4 direction.
Design decisions
Check the room’s performance, not only its appearance
A bathroom that looks finished can still fail if ventilation, waterproofing or slopes are wrong. The practical decision is whether the surfaces are suitable for the intended use and whether the room can be maintained easily afterwards. That is why the background work matters as much as the tiles or suite.
At handover, ask for a walk-through of the sealed joints, the operation of taps and fittings, and any areas that remain dependent on another specialist or on drying time. That conversation helps you see whether the room is ready for use in practice, while still relying on the relevant professional approvals where required.
Design checks
Four things we confirm before drawing a bathroom installation.
- 01Confirm the drainage, supply and ventilation plan before the suite is ordered.
- 02Separate demolition, waterproofing, tiling and fitting in the scope.
- 03Check that adjoining rooms are protected where floors or walls are opened.
- 04Agree what will be demonstrated at handover: fixtures, seals and any remaining drying time.
Questions
Before you call about Greenwich.
What should I check in a bathroom handover?
Check the fittings operate properly, the joints are neat, the ventilation has been included as agreed and any areas still curing or awaiting a final trade are identified. That gives you a realistic view of whether the room is ready to use.
Why does a bathroom affect the room below?
Because pipe routes, leaks, floor build-ups and access openings can all involve the structure beneath. If the bathroom is upstairs, the ceiling or walls below may also need protection or making good as part of the project.
When does a bathroom need more planning than a simple replacement?
When the layout changes, the drainage moves or the room is being rebuilt rather than refreshed. At that point the job depends on coordinated services, surface preparation and the correct approval route, not just on choosing a new suite.
Planning and project guidance
- Find out if you need planning permission | Royal Borough of Greenwich
- GOV.UK · Planning permission
- GOV.UK · Building regulations approval
- GOV.UK · Party walls and building work
Check the current guidance for your address before relying on a planning route. This guide is not a planning decision or a verified local case study.
Other services in Greenwich







