A new build succeeds when the site, the design and the approval route are all decided together. Before anything is built, the owner needs to know what the plot allows, who is responsible for which approvals and what proof will be needed at completion.

- Service
- New build
- Neighbourhood
- Greenwich
- Borough
- Greenwich
- Next step
- Discuss your project
Your project brief
Begin with the plot, not the floor plan
A new home is shaped by access, boundaries and services before the layout is finalised. If the site is tight, the position of scaffolding, deliveries, drainage runs and safe working space can change the build sequence. Those issues need checking early because they affect both cost planning and whether the design is practical to construct.
The design also has to fit the ground and the legal boundaries, not just the sketch. That means confirming what the plot contains, what can be reached and what constraints apply to the site as a whole before structural information is locked in.
Greenwich-specific checks for a new home
Greenwich’s planning guidance says you should find out if permission is needed before building work starts, and that new buildings are among the projects likely to need it. The same page points to building control for new property work. Because the borough page is only a starting point, exact address checks still matter, especially where the site, use or ownership may raise separate issues.
Design decisions
Separate approvals, structure and completion paperwork
Planning permission and building control are different parts of the process. Greenwich notes that new buildings are likely to need planning permission, while building control may be needed for new property construction. You should not assume one step covers the other, and lease or ownership matters need their own checks as well.
At contract stage, define what evidence the builder will hand over: inspection records, product data, installation certificates from the relevant specialists and any documents needed to show the home was completed to the agreed specification. That makes the finish stage much easier to manage because there is no dispute about what counts as complete.
Design checks
Four things we confirm before drawing a new-build home.
- 01Confirm the plot boundary, access route and any known site constraints.
- 02Set out who handles planning, building control and any separate ownership consent.
- 03Define the structural, services and finishing information before construction starts.
- 04Agree the handover pack: inspection records, specialist certificates and completion documents.
Questions
Before you call about Greenwich.
What should a homeowner ask before a new-build contract is signed?
Ask who is responsible for each approval, which inspections are included, and what documents will be handed over at the end. You should also check how changes are instructed if the site conditions differ from the original design information.
Why does a new build need more than a general drawing set?
Because the plot, structure and services all need to work together. A general drawing may show the appearance, but the build also depends on how drainage, foundations, access and service routes are coordinated and documented for construction and completion.
How can handover checks help with a new build?
They help you compare what was promised with what was actually installed. You can confirm finishes, operation of doors and windows, service information and any outstanding snagging, while still relying on the relevant professional approvals for compliance.
Planning and project guidance
- Find out if you need planning permission | Royal Borough of Greenwich
- GOV.UK · Planning permission
- GOV.UK · Building regulations approval
- GOV.UK · Party walls and building work
Check the current guidance for your address before relying on a planning route. This guide is not a planning decision or a verified local case study.