A house renovation works best when the sequence is clear before any demolition begins. That means deciding what stays, what changes and what evidence you need if the work uncovers something unexpected behind walls, floors or ceilings.

Service
House renovation
Neighbourhood
Greenwich
Borough
Greenwich
Next step
Discuss your project

Your project brief

Start with what the renovation must protect

The first decision is not the new finish; it is how the work affects the rest of the house. If a wall comes out, a room below may need structural support, acoustic treatment or replastering. If services are being moved, rooms behind the works may need temporary shut-off, protection and later reinstatement.

A proper scope records existing defects and previous alterations before work starts. That helps separate old movement, damp staining, worn finishes and later damage caused by the renovation itself, so you can judge what must be repaired as part of the contract and what is simply an historic issue.

Greenwich checks before you commit to the scope

In Greenwich, the council advises checking planning permission before starting work, especially where you are extending or altering the external appearance of a home. The page also notes that flats, maisonettes, listed buildings, conservation areas and Article 4 directions may need permission in most cases. That does not decide your exact plot; the address must still be checked. Building control approval may also be needed for structural changes, and ownership or lease consent is separate again.

Design decisions

Keep structure, services and decoration in separate baskets

Renovation problems often arise when one trade’s assumptions are treated as another trade’s job. Structural changes, plumbing and electrical alterations, plaster repairs and decoration should be itemised separately. That makes it easier to see which stage affects the rooms below or behind the work, and which stage only finishes the surface.

If access routes, bathrooms or a kitchen need to stay usable during the project, agree that early. A live-in renovation can require phased work, temporary protection and a clear plan for making good after each stage rather than waiting until the end.

Design checks

Four things we confirm before drawing a house renovation.

  1. 01Record cracks, damp, uneven floors and previous patch repairs before work starts.
  2. 02List which rooms below or behind the works may need protection, access or reinstatement.
  3. 03Separate structural, services and finishing tasks in the written scope.
  4. 04Agree handover records for hidden works, test results and any exclusions.

Questions

Before you call about Greenwich.

More detail on this service: House renovation at DWM Construction
How do I judge whether a renovation has affected the rooms beneath it?

Look for new movement, staining, sound transfer, surface cracking or disturbed finishes after the work stage that could have caused them. Compare that with the pre-work record so you can tell old issues from newly introduced damage or reinstatement needs.

What should I ask about at handover if the project included hidden work?

Ask which walls, floors or ceilings were opened, what was replaced, and what remains concealed. You should also receive any agreed test records, product details and a clear list of items excluded from the finish if they were not part of the scope.

When does a renovation need more than a cosmetic specification?

If the work changes the building fabric, services or load-bearing elements, the job needs a fuller brief than a finish schedule. That is the point where surveys, design information and the right approvals become part of the planning rather than a later afterthought.

Planning and project guidance

Check the current guidance for your address before relying on a planning route. This guide is not a planning decision or a verified local case study.

Planning house renovation in Greenwich? Explore the full service, then discuss your project with us.

Client feedback · Google reviews

What our clients say.

DWM Construction Ltd

Google

5.0 ★★★★★

53 reviews · checked 14 November 2026

★★★★★

“Highly recommend Danny. He completed our kitchen, upstairs and downstairs bathrooms, fascia boards and roof vent tiles to a great quality.”

Ali EgilmezRead on Google ↗
★★★★★

“Having recently used DWM Construction Ltd for a loft and kitchen extension, I can’t praise the team highly enough.”

Malvina HaxhijuRead on Google ↗
★★★★★

“We can't thank Danny and his team enough for the incredible work they did on our bathroom, toilet, and kitchen renovation.”

Aimee WebsterRead on Google ↗

Review excerpts from Google Maps. Rating and review count reflect the date checked.

Read all Google reviews

Company profiles · Social

Find DWM online.

Explore our company profiles, see project updates and follow DWM Construction across the web.

Links open the external sites in a new tab. Listings are maintained by each third-party site.