Greenwich · South London
Kitchensin Greenwich.
A good kitchen is not just about choosing cabinets. The room has to work as a sequence of measured choices: layout, services, surfaces and how the new units meet the rest of the house. That is especially important when the room below or behind needs protection or later making good.

- Service
- Kitchens
- Neighbourhood
- Greenwich
- Borough
- Greenwich
- Next step
- Discuss your project
Your project brief
Start with how the room will be used
Before installation, think through cooking, storage, prep space and whether the room needs to double as a passage. If the layout changes, the floor, walls and service positions may need adjustment first. That can affect the room behind the kitchen if plumbing, electrics or ventilation are being re-routed through adjacent spaces.
A kitchen scope should separate the building work from the furniture. Removing old units, repairing walls and floors, and preparing the room are different tasks from fitting cabinets and worktops. If those stages are blurred, it is easy to miss hidden damage until the new units are already on site.
Greenwich checks before a kitchen refit
Greenwich’s planning guidance says some home projects do not need permission, while others do, especially where the external appearance changes or the property falls into a special category such as a listed building or a conservation area. A kitchen refit inside an existing home is not automatically a planning matter, but any wider alteration still needs address-specific checking. Building control may also apply where structural changes are part of the job.
Design decisions
Coordinate the supplier, fitter and services early
Worktops often depend on accurate final measurements, while appliances and sinks depend on confirmed service positions. If those are left undecided, the room can become awkward to finish cleanly. The safest approach is to confirm the order of works, including any first-fix plumbing or electrical alterations, before the units are ordered.
At handover, ask for a practical walk-through: doors and drawers opening freely, worktops secure, sealant lines neat, and appliances or taps functioning as specified. That does not replace specialist completion records where they are needed, but it helps you check the room against the agreed scope.
Design checks
Four things we confirm before drawing a kitchen installation.
- 01Confirm whether walls, floors or services need repair before the units go in.
- 02Set the final appliance and sink positions before ordering worktops.
- 03Separate cabinet fitting from plumbing, electrics and decoration in the scope.
- 04Check that doors, drawers, seals and visible junctions are complete at handover.
What should I inspect when the kitchen is handed over?
Check that the cabinets are level, doors and drawers open correctly, worktops are secure and all agreed services are connected. You should also know what remains outstanding, especially if the final decoration or a specialist test is still to come.
How do kitchen works affect adjoining rooms?
They can affect them through service routes, temporary removal of walls or floors, dust and access restrictions. If pipes or cables pass through another room, that room may need protective work or later making good as part of the overall project.
When is kitchen planning more than a furniture decision?
When the layout changes the building work behind it. Once you move sinks, appliances or walls, the room becomes a coordination exercise involving structure, services and finishes rather than a simple cabinet replacement.
Planning and project guidance
- Find out if you need planning permission | Royal Borough of Greenwich
- GOV.UK · Planning permission
- GOV.UK · Building regulations approval
- GOV.UK · Party walls and building work
Check the current guidance for your address before relying on a planning route. This guide is not a planning decision or a verified local case study.
Other services in Greenwich







