Greenwich · South London
Doorsin Greenwich.
A door project looks simple until you start checking the opening, frame and surrounding finishes. The right decision is whether the existing frame can be kept, what clearances are needed and how the door will work with the room’s purpose and nearby surfaces.

- Service
- Doors
- Neighbourhood
- Greenwich
- Borough
- Greenwich
- Next step
- Discuss your project
Your project brief
Decide whether the frame stays or goes
The first question is often whether the existing frame is accurate enough to keep. If the opening is out of square, the floor level has changed or the linings are damaged, a replacement door alone may not solve the problem. The fitting decision should reflect the opening as it really is, not as it was originally built.
That matters to the adjoining room because poor clearances can affect carpets, thresholds, trims and even ventilation gaps. A tidy-looking door that drags or binds is not a proper finish, so the measurement stage is as important as the final appearance.
Greenwich checks before changing doors or openings
Greenwich’s planning guidance is mainly about external changes, extensions, new buildings and certain special property categories. An internal door swap is not automatically one of those cases, but an altered opening or external door may need address-specific checking. For listed buildings or homes under other controls, changes affecting character can need separate consent even if the work seems modest.
Design decisions
Match the door to the room’s role and performance needs
An internal door for a bedroom, bathroom or corridor may need different hardware or detailing depending on how it is used. External doors and altered openings require a more careful check of installation requirements. The scope should therefore cover the intended use, hardware and making-good around the opening.
At handover, check swing, latch action, alignment and the neatness of architraves or trim. If the door is part of a wider project, ask what finishing work remains around the opening so you know whether the room is truly complete or only functionally fitted.
Design checks
Four things we confirm before drawing door installation.
- 01Check the opening, frame and floor levels before ordering the door.
- 02Confirm the intended use and any hardware or performance needs.
- 03Separate making-good around the opening from the door fitting itself.
- 04Ask what finishing work remains once the door is installed and aligned.
What is the most important handover check for a new door?
Check that it opens and closes smoothly, latches correctly and clears nearby surfaces. A good door is one that works well as part of the room, not just one that looks neat from the front.
Why might the frame need replacing as well?
If the opening is out of square, damaged or no longer suits the new door size, keeping the old frame can cause ongoing problems. The frame and door often need to be assessed together to get the right result.
How do door works affect the adjoining room?
They can affect trim lines, floor edges, thresholds and the feeling of space. If the opening changes, the surrounding room may also need making good so the finished detail looks intentional rather than patched.
Planning and project guidance
- Find out if you need planning permission | Royal Borough of Greenwich
- GOV.UK · Planning permission
- GOV.UK · Building regulations approval
- GOV.UK · Party walls and building work
Check the current guidance for your address before relying on a planning route. This guide is not a planning decision or a verified local case study.
Other services in Greenwich







