Richmond upon Thames · West London
Bathroomsin Richmond.
Bathroom design is about how the room performs once the surfaces are finished, not just how it looks on installation day. In Richmond, the key decisions are layout, water and waste routes, waterproofing and ventilation, so the room works as a whole rather than as a collection of fittings.

- Service
- Bathrooms
- Neighbourhood
- Richmond
- Borough
- Richmond upon Thames
- Next step
- Discuss your project
Your project brief
Build the bathroom around the services beneath it
A bathroom is hard to use well if the drainage route is awkward or the water positions do not suit the chosen layout. A survey should check the available connections, the condition of the existing background and whether the proposed arrangement will need additional boxing-in or floor work.
That assessment is especially important if the suite is moving or the room is being reconfigured. The tile finish and the visible fittings depend on what happens underneath them, so the services plan should be settled before the room is closed up. Otherwise, neat-looking drawings can lead to messy changes later.
Richmond address checks for bathroom projects with external changes
Richmond upon Thames says any home in the borough can be subject to an Article 4 Direction, and some places are also subject to conservation-related controls. Most bathroom work is internal, but if the project includes new openings, altered windows or another outside change, the exact address must be checked. Borough-wide evidence is not enough to assume every property follows the same route.
Design decisions
Separate wet-room performance from the decorative finish
A bathroom needs a suitable background, waterproofing where specified and a ventilation approach that matches the room’s use. Those are not decorative extras; they protect the room once the new suite is in place. The scope should say what is included so the waterproofing, tiling and finishing do not blur together.
If the project includes replacing the whole room, make clear whether removal of the old suite, making good, tiling and final fittings are all part of the same package. That helps the homeowner compare offers properly and makes it easier to see whether any specialist trade input is needed for the final stage.
Design checks
Four things we confirm before drawing a bathroom installation.
- 01Removal of the existing bathroom and preparation within an agreed refurbishment scope.
- 02Sanitaryware, showers, baths and taps, coordinated with water and waste connections.
- 03Suitable backgrounds, waterproofing systems and tiling where specified.
- 04Ventilation, lighting and finishing work coordinated with the relevant trades.
What is the biggest mistake people make with bathroom planning?
They focus on the suite they want and leave the hidden services until later. That can force expensive changes to drainage, pipe routes or boxing-in after the room is already designed.
Should waterproofing and tiling be treated as the same thing?
No. Waterproofing protects the room behind the finish, while tiling is the visible surface. The scope should show both so their roles are not confused.
Why does ventilation belong in the bathroom scope?
Because moisture management affects how the room performs over time. If ventilation is overlooked, the finish can suffer from damp, mould or condensation even when the fittings are good.
Planning and project guidance
- Article 4 Directions - Conservation areas - London Borough of Richmond upon Thames
- GOV.UK · Planning permission
- GOV.UK · Building regulations approval
- GOV.UK · Party walls and building work
Check the current guidance for your address before relying on a planning route. This guide is not a planning decision or a verified local case study.
Other services in Richmond







