Richmond upon Thames · West London

New buildin Richmond.

A new build needs decisions to be joined up from the start. In Richmond, the plot, access, approvals, structure and services all shape whether the home can be built as drawn. The first task is not the finish level, but proving what the site can support and what records will be needed at the end.

Service
New build
Neighbourhood
Richmond
Borough
Richmond upon Thames
Next step
Discuss your project

Your project brief

Build the brief around the plot, not a wish list

A new home has to work with boundaries, access and the space available for construction. If the site is tight, the route for deliveries, storage, skips and scaffolding may influence the house form before any room layout is settled. Good design starts with these practical limits.

That is where a measured survey and site review help. They show the slope, levels, surrounding constraints and any features that could affect the footprint, service runs or drainage strategy. A plan that ignores those matters may look neat but fail once the build sequence is considered.

Richmond address checks for a new home

Richmond upon Thames says any home in the borough can be subject to an Article 4 Direction, and conservation-related controls may apply in some places. For a new build, the planning route must be checked against the exact address and site, not assumed from the borough name alone. A site-specific review is also sensible before works begin if the proposal touches external appearance, access or the boundary arrangement.

Design decisions

Separate approvals, structure and services from the start

New dwellings need a site-specific planning route rather than assumptions taken from householder work. Building control, structural information and services planning also need to be coordinated, because each one affects the other. For example, a staircase position can influence structure, fire safety, ventilation and service routes at once.

The written scope should say who is responsible for each package, what drawings are still required and what evidence will be handed over. That avoids gaps between architect, engineer, builder and specialist trades, especially where the house depends on accurate openings, service penetrations and inspection records.

Design checks

Four things we confirm before drawing a new-build home.

  1. 01Establish plot boundaries, access and site constraints.
  2. 02Coordinate the design, structural information and services strategy.
  3. 03Confirm planning and building-control responsibilities before construction.
  4. 04Define specifications, inspections and completion evidence in the contract scope.

Questions

Before you call about Richmond.

More detail on this service: New build at DWM Construction
What should be resolved before a new-build layout is treated as final?

The site limits, boundary position, access for construction and the main service strategy should be known first. Without those, room sizes, openings and structure may all need changing later.

How can assumptions be handled properly in a new-build scope?

List each assumption, such as ground conditions, service points or retained access, then state what evidence is needed to confirm it. If it changes, the scope should say who reviews the cost and design impact.

Why is completion evidence important on a new build?

It proves what was installed and inspected, which matters for later maintenance, compliance and future alterations. The scope should name the records needed before the project is signed off.

Planning and project guidance

Check the current guidance for your address before relying on a planning route. This guide is not a planning decision or a verified local case study.

Planning new build in Richmond? Explore the full service, then discuss your project with us.

Client feedback · Google reviews

What our clients say.

DWM Construction Ltd

Google

5.0 ★★★★★

53 reviews · checked 14 November 2026

★★★★★

“Highly recommend Danny. He completed our kitchen, upstairs and downstairs bathrooms, fascia boards and roof vent tiles to a great quality.”

Ali EgilmezRead on Google ↗
★★★★★

“Having recently used DWM Construction Ltd for a loft and kitchen extension, I can’t praise the team highly enough.”

Malvina HaxhijuRead on Google ↗
★★★★★

“We can't thank Danny and his team enough for the incredible work they did on our bathroom, toilet, and kitchen renovation.”

Aimee WebsterRead on Google ↗

Review excerpts from Google Maps. Rating and review count reflect the date checked.

Read all Google reviews

Company profiles · Social

Find DWM online.

Explore our company profiles, see project updates and follow DWM Construction across the web.

Links open the external sites in a new tab. Listings are maintained by each third-party site.