Decorating is where a room’s look is finally pulled together, but only if the earlier work is finished properly. In Richmond, the practical decision is whether the background, sequence and chosen finishes are ready for decoration, rather than assuming colour alone will make the room feel complete.

- Service
- Decorating
- Neighbourhood
- Richmond
- Borough
- Richmond upon Thames
- Next step
- Discuss your project
Your project brief
Choose finishes after the room is technically ready
Wallpaper, paint and feature details all depend on the surface beneath them. If the plaster is still drying, trim is incomplete, or the room has not had its disruptive work finished, the decorative stage can be delayed or spoiled. It is better to schedule decorating after the build-up has settled.
This matters because decorating is often the most visible stage, but not the first one that needs planning. The scope should say which surfaces are being decorated, what preparation they need and whether any earlier repair work is still outstanding. That keeps the job from becoming a catch-all for unfinished building tasks.
Richmond address checks for decorative external changes
Richmond upon Thames says any home in the borough can be subject to an Article 4 Direction, and some places are also covered by conservation-related controls. That is mainly relevant if decorating includes external work such as painting or rendering. An exact-address check is still needed, because the borough fact alone does not prove the rule applies to every home.
Design decisions
Sequence the detail work so the finish stays clean
A good decorative result depends on the order of work. Wallpaper needs a suitable background and careful alignment, while painted trim needs clean edges and the right sequence around frames, skirting and junctions. If the details are not planned, the result can look hurried even when the materials are good.
For example, if a room is having new flooring or carpentry, the decoration sequence should be clear before work starts. That way the decorator is not forced to make fresh repairs to a finish that another trade has disturbed. Writing the sequence into the scope helps protect the end result.
Design checks
Four things we confirm before drawing decorating work.
- 01Wallcovering preparation and wallpaper hanging where the background is suitable.
- 02Feature walls and coordinated room finishes within the agreed specification.
- 03Final detailing around trim, frames and adjoining surfaces.
- 04Decorating after refurbishment once disruptive building work has finished.
Questions
Before you call about Richmond.
Why should decorating wait until the building work is finished?
Because fresh repairs, dust and ongoing trades can damage the finish. Decorating is best done once the room is stable, clean and no longer being opened up.
How should feature walls be handled in the scope?
List them separately so the materials, pattern alignment and finish lines are clear. That avoids the feature area being treated as an informal extra without proper preparation.
What is the main risk of decorating too early?
You may end up touching up the same surfaces repeatedly as other work continues. That wastes time and can leave visible joins, marks or uneven edges.
Planning and project guidance
- Article 4 Directions - Conservation areas - London Borough of Richmond upon Thames
- GOV.UK · Planning permission
- GOV.UK · Building regulations approval
- GOV.UK · Party walls and building work
Check the current guidance for your address before relying on a planning route. This guide is not a planning decision or a verified local case study.
Other services in Richmond