Greenwich · South London
Bathroomsin Eltham.
A bathroom can look finished while still failing at the practical level. The real job is to make the room work behind the surfaces as well as in front of them: layout, water, waste, waterproofing and ventilation all need to be decided in the right order.

- Service
- Bathrooms
- Neighbourhood
- Eltham
- Borough
- Greenwich
- Next step
- Discuss your project
Your project brief
Start with layout and service routes
The position of the bath, shower, basin and WC affects everything that follows. Drainage falls, water feeds and access for maintenance all need to be realistic before the suite is ordered. A good-looking plan that ignores those routes will usually force redesign later.
If the bathroom is part of a larger family-space brief, the layout should stay as simple as possible. That may mean keeping the room more restrained, with clear circulation and sensible storage, rather than trying to squeeze in every possible fixture.
Check Greenwich guidance if the bathroom sits within a wider alteration
Greenwich council says planning permission and building control are separate questions, and the exact property matters before any route is chosen. For an Eltham bathroom, that means the room itself is not assumed to trigger permission, but the wider project may still need checking if it changes the building or affects the exterior.
Design decisions
Treat waterproofing and ventilation as part of the design
A bathroom needs more than attractive tiles. The surfaces behind the finish have to handle moisture, especially around showers and baths. Waterproofing and suitable backgrounds should therefore be agreed with the tiling and fit-out sequence, not left until the end.
Ventilation also matters because it helps protect the room over time. It should be considered alongside lighting and finishes so the room is comfortable to use and easier to maintain after the work is complete.
Design checks
Four things we confirm before drawing a bathroom installation.
- 01Agree the bathroom layout before ordering the suite or tiles.
- 02Check drainage, water supply and access for maintenance early.
- 03Include waterproofing and ventilation in the written scope.
- 04Separate the visible finish from the systems behind it.
What makes a bathroom layout work well in practice?
Clear movement, sensible storage and realistic service routes. A bathroom works best when the fixtures suit the room rather than being forced into place.
Why do waterproofing and ventilation need to be considered together?
Because moisture management is not just about one product. The room needs surfaces that resist water and airflow that helps the space dry out properly.
Should a bathroom design be overly complex to feel luxurious?
Not necessarily. A restrained layout can feel more comfortable and is often easier to use, clean and maintain than one packed with features.
Planning and project guidance
- Find out if you need planning permission | Royal Borough of Greenwich
- GOV.UK · Planning permission
- GOV.UK · Building regulations approval
- GOV.UK · Party walls and building work
Check the current guidance for your address before relying on a planning route. This guide is not a planning decision or a verified local case study.
Other services in Eltham







