Greenwich · South London
House renovationin Eltham.
A renovation works best when each decision follows the last, rather than forcing a redesign halfway through. For an Eltham home, that usually means starting with what is already there, then shaping the layout around structural limits, services routes and the finish you want to live with.

- Service
- House renovation
- Neighbourhood
- Eltham
- Borough
- Greenwich
- Next step
- Discuss your project
Your project brief
Start with the existing building, not the wish list
The first useful step is a proper survey of measurements, defects and earlier alterations. That tells you which walls are fixed, where floors or ceilings are out of line, and whether previous work has already changed the original layout. Without that baseline, new ideas can quickly become expensive compromises.
It also helps to separate cosmetic tiredness from real building issues. A room may look ready for new finishes, but hidden movement, damp, poor patching or awkward pipework can change the whole renovation sequence. If you know that early, the scope can be written around reality rather than assumption.
Greenwich checks before you lock the scope
Greenwich council guidance says planning permission should be checked before building work begins, and that some home changes are still allowed without it. It also notes extra caution for flats, maisonettes, listed buildings, conservation areas and Article 4 directions. For an Eltham address, the exact property must be checked rather than assuming the borough-wide position applies to every home.
Design decisions
Order the work so the layout stays restrained
Once the existing conditions are clear, the next decision is what absolutely needs moving. In a flexible family-space brief, that usually means protecting circulation, storage and sightlines before adding more features. A restrained layout often works better than trying to create several new zones in one room.
After that, structural changes and service changes should be coordinated together. If an opening is widened, the heating, electrics and plumbing may need to move with it. Finishes come last because they should follow the confirmed layout, not drive it.
Design checks
Four things we confirm before drawing a house renovation.
- 01Record existing defects and previous alterations before design work starts.
- 02Separate structural changes, service upgrades and decorative work in the written scope.
- 03Discuss occupancy, safe access and essential services during the build.
- 04Agree investigations, approvals, exclusions and handover records before work begins.
Questions
Before you call about Eltham.
How does a family-space brief stay flexible without turning into a vague plan?
By deciding what must remain easy to change, such as furniture positions and storage, while fixing the parts that affect structure and services. That keeps the room adaptable without repeatedly revisiting the layout.
What should be settled before choosing finishes in a renovation?
The usable floor area, any structural changes, service routes and where patching will be needed should come first. Finishes should then respond to the final plan, not force it.
Why can a renovation need investigation before a full design is drawn up?
Because hidden defects or previous alterations often affect what is possible. Early investigation reduces redesign and helps the scope include the right repairs, permissions and trade sequencing.
Planning and project guidance
- Find out if you need planning permission | Royal Borough of Greenwich
- GOV.UK · Planning permission
- GOV.UK · Building regulations approval
- GOV.UK · Party walls and building work
Check the current guidance for your address before relying on a planning route. This guide is not a planning decision or a verified local case study.
Other services in Eltham








