Greenwich · South London
Electrical workin Eltham.
Electrical planning is easiest when the room is still being shaped. Lighting, switches and sockets should follow how the space will be used, and they often need to be settled before plastering or fitted joinery closes off the walls.

- Service
- Electrical work
- Neighbourhood
- Eltham
- Borough
- Greenwich
- Next step
- Discuss your project
Your project brief
Design the positions around daily use
The first decision is where people will actually stand, sit and work in the room. Socket and switch positions should support that use rather than being squeezed into whatever gaps remain. If the room is flexible, the electrical layout should still be precise enough to avoid awkward extension leads or poor lighting.
In a kitchen or bathroom, the services strategy needs to sit alongside the room plan. Appliances, mirrors, task lights and storage all affect where the electrical points belong, so the electrical scope should be coordinated with the rest of the build, not added later as an afterthought.
Check the Eltham property against Greenwich guidance before the wider project is fixed
Greenwich council says building control may be needed where structural changes are involved, and planning permission may matter for the wider scheme. Electrical work itself is usually part of a larger home project rather than a standalone planning issue. For an Eltham address, the exact scope and property should be checked before the layout is finalised.
Design decisions
Keep the installation sequence clear
Electrical first-fix work is usually best handled before surfaces are closed and finishes are set. The later second-fix stage then completes the visible items once the room is ready. That sequence helps avoid cutting into fresh plaster or finished joinery.
The scope should also note any required specialist input, testing and completion records. The practical point is not to improvise around those requirements, but to build them into the plan so the installation and the handover match.
Design checks
Four things we confirm before drawing electrical work.
- 01Set socket and switch positions around how the room will be used.
- 02Coordinate the electrical plan with kitchens, bathrooms or joinery.
- 03Separate first-fix and second-fix work in the programme.
- 04Identify required testing and completion records in the scope.
Questions
Before you call about Eltham.
Why should electrical work be planned before plastering?
Because cables, boxes and fittings are easier to install before the walls are closed. Doing the electrical design early avoids cutting into fresh finishes later.
What should be decided for a family room with flexible use?
The lighting zones, socket positions and any dedicated power points should match likely activities. That keeps the room practical even if the furniture arrangement changes over time.
How does electrical work fit with other trades?
It usually sits between the structural stage and the finishing stage. That means the route, openings and final surfaces all need to be coordinated, not handled separately.
Planning and project guidance
- Find out if you need planning permission | Royal Borough of Greenwich
- GOV.UK · Planning permission
- GOV.UK · Building regulations approval
- GOV.UK · Party walls and building work
Check the current guidance for your address before relying on a planning route. This guide is not a planning decision or a verified local case study.
Other services in Eltham







