Greenwich · South London
Plasteringin Eltham.
Plastering is not just about a smooth surface at the end. The real decision is what lies beneath it: whether the wall needs repair, lining, levelling or a full plaster system. Getting that right avoids poor adhesion, visible defects and repeated patching later.

- Service
- Plastering
- Neighbourhood
- Eltham
- Borough
- Greenwich
- Next step
- Discuss your project
Your project brief
Match the plastering method to the background
A sound wall with small blemishes needs a different approach from a wall that is loose, uneven or freshly altered. Before any plaster is chosen, the existing background should be checked for stability, contamination and previous patchwork. That tells you whether the surface can be made good or needs more help.
If the wall is after structural work, rewiring or pipe changes, the repair may need to cover more than the visible chase lines. The extent of the making good should be agreed in advance so the finish does not expose earlier shortcuts.
Check whether the work sits within a wider Greenwich project
Greenwich guidance says building control may be needed where structural changes are involved, and planning questions should be checked before work begins when the wider project includes alterations. For an Eltham property, that does not mean every plastering job needs approval; it means the exact scope and address should be checked before the room plan is fixed.
Design decisions
Choose between repair, boarding and levelling
New plasterboard can be the better option where the existing wall is too uneven or damaged for a reliable finish. In other cases, a base-coat system or careful levelling may be enough. The choice depends on the wall’s condition and the finish expected afterwards.
For a room being refurbished, it is sensible to separate structural patching from decorative finishing. That way the plastering scope stays focused on creating a stable surface, rather than trying to solve every other trade’s issue as well.
Design checks
Four things we confirm before drawing plastering work.
- 01Record whether the wall or ceiling needs repair, boarding or levelling.
- 02Check for loose material, damp staining and previous patching before starting.
- 03Agree the extent of making good around openings, reveals and junctions.
- 04Separate plastering work from decoration so the finish stage stays clear.
When does a plastering job need more than a skim?
When the background is unstable, very uneven or newly altered. In those cases, the surface may need repair or boarding first, otherwise the final finish is likely to fail or telegraph defects.
Why check the wall condition before choosing a plaster system?
Because the wrong system can hide neither movement nor poor adhesion. Early checks make it easier to decide whether the wall needs levelling, patching or a full reline.
How does plastering fit into a larger renovation sequence?
It usually follows the messy building work and comes before decoration. That keeps patch repairs, new openings and service chases within the same scope instead of interrupting the final finish.
Planning and project guidance
- Find out if you need planning permission | Royal Borough of Greenwich
- GOV.UK · Planning permission
- GOV.UK · Building regulations approval
- GOV.UK · Party walls and building work
Check the current guidance for your address before relying on a planning route. This guide is not a planning decision or a verified local case study.