Greenwich · South London
Plumbingin Eltham.
Plumbing decisions are easiest to make when the layout is still open. Moving a sink, fitting a new bathroom or changing a kitchen can alter water supplies, drainage routes and access to pipework, so the order of decisions matters just as much as the fittings themselves.

- Service
- Plumbing
- Neighbourhood
- Eltham
- Borough
- Greenwich
- Next step
- Discuss your project
Your project brief
Trace the route before choosing the fixtures
The practical question is not only what sanitaryware you want, but where the pipework can realistically go. Existing water supply and waste routes may support an easy change, or they may make a proposed layout awkward. That is why the room plan should be checked before the fittings are ordered.
If pipework is partly hidden or difficult to access, it is worth defining what will be investigated and what will be left alone. A clear scope helps avoid opening up more of the house than is necessary.
Check the exact Eltham address against Greenwich guidance
Greenwich guidance says building control may be needed for structural changes and that planning permission can be relevant if the wider project changes the building. Plumbing itself is not automatically a planning matter. For an Eltham home, the exact address and the full scope should be checked before decisions are fixed, especially if the work is part of a larger renovation.
Design decisions
Separate first-fix work from the visible finish
In a renovation, plumbing often happens in two stages. First-fix work sets the routes and connections while the building work is still open. Second-fix work completes the visible items later, after the walls, floors and cabinetry are ready. Keeping those stages distinct helps the rest of the project stay coordinated.
This is especially useful in a flexible family-space brief where the layout may shift. For example, if a kitchen island or a bathroom storage run is still under discussion, the plumbing should not be set too early without confirming the final arrangement.
Design checks
Four things we confirm before drawing plumbing work.
- 01Map supply and waste routes before confirming the room layout.
- 02Decide what pipework is accessible and what needs investigation.
- 03Separate first-fix plumbing from the later visible installation.
- 04Keep kitchen or bathroom changes aligned with the wider building scope.
Why does plumbing need to be considered before walls are closed?
Because once the surfaces are finished, moving pipework becomes more disruptive. Early planning reduces the chance of reopening the room to correct layout or connection problems.
What should be agreed if a sink or bathroom is moving position?
The new supply route, waste route, access for maintenance and any related building work should all be clear. That stops the plumbing from conflicting with cabinets, screens or finished surfaces.
How can plumbing fit a flexible family layout?
By allowing the room plan to stay adaptable until the main routes and service points are confirmed. The layout can still change, but the hidden infrastructure should be settled at the right time.
Planning and project guidance
- Find out if you need planning permission | Royal Borough of Greenwich
- GOV.UK · Planning permission
- GOV.UK · Building regulations approval
- GOV.UK · Party walls and building work
Check the current guidance for your address before relying on a planning route. This guide is not a planning decision or a verified local case study.