Greenwich · South London
Kitchensin Eltham.
A kitchen is easiest to get right when the plan starts with daily use, not with the catalogue. Cooking, storage, dining and circulation all affect the layout, and the job becomes simpler when those decisions are made before the building work and installations are fixed.

- Service
- Kitchens
- Neighbourhood
- Eltham
- Borough
- Greenwich
- Next step
- Discuss your project
Your project brief
Shape the layout around use, not just style
The first question is how the room needs to work. A family kitchen may need clear routes between cooking, storage and seating, while a smaller space may need a more restrained arrangement to avoid crowding. If those movements are not mapped first, the final kitchen can look complete but feel awkward.
Once the working pattern is clear, the renovation scope can distinguish between the cabinets and the enabling work. Walls, floors, plumbing and electrics often need attention before the units go in, and it is better to acknowledge that than to squeeze it into the last stage.
Use Greenwich’s planning check before the kitchen scope is signed off
Greenwich council says some home alterations do not need planning permission, but the exact property matters, especially for flats, maisonettes, listed buildings, conservation areas and Article 4 directions. For an Eltham kitchen, that means the address should be checked before the design is locked in, particularly if the project affects the external appearance or forms part of a wider alteration.
Design decisions
Fix the sequence for units, services and finishes
Kitchen installation should be coordinated with the trades that support it. Cabinet positions affect sockets, plumbing points, lighting and even the sequence of flooring. Worktops are best measured and fitted once the surrounding units are confirmed, not before.
A restrained layout helps here too. If the family-space brief is flexible, it may be better to keep storage and seating simple rather than forcing extra features into the plan. That makes future changes easier without disturbing the core kitchen function.
Design checks
Four things we confirm before drawing a kitchen installation.
- 01Agree how the room will be used before choosing units or finishes.
- 02Record any wall, floor or service changes needed for the new layout.
- 03Coordinate worktop measurement after the cabinets and openings are settled.
- 04Include plumbing and electrical requirements in the written kitchen scope.
What should be decided first in a kitchen renovation?
The use of the room: cooking, storage, dining and movement. That gives the layout a purpose and helps the rest of the work, from services to finishes, follow a clear sequence.
Why not order worktops before the installation is settled?
Because cabinet positions, wall lines and finishing details can still shift during the build. Measuring too early risks a poor fit or avoidable changes when the room is finally ready.
How does a flexible family brief influence the kitchen plan?
It usually leads to a simpler, more adaptable layout with fewer fixed assumptions. That keeps the kitchen usable for everyday life while leaving room for future changes in furniture or use.
Planning and project guidance
- Find out if you need planning permission | Royal Borough of Greenwich
- GOV.UK · Planning permission
- GOV.UK · Building regulations approval
- GOV.UK · Party walls and building work
Check the current guidance for your address before relying on a planning route. This guide is not a planning decision or a verified local case study.
Other services in Eltham







